002 CWRK - Product Study Assignment

Download Solution Order New Solution

Assignment Task

A component used as a part of a power transmission unit is manufactured using a lathe.

Twenty samples, each of five components, are taken at half-hourly intervals. Within the flow of the day a number of (non-)technical incidents appear. These include taking a lunch break and adjusting or resetting the machine.

For the most critical dimension, the process mean (????¯) is found to be 3.500 cm, with a normal distribution of the results about the mean, and a mean sample range (????¯) of 0.0007 cm.

With the above scenario in mind, complete the following tasks considering the data.

  1. Use this information to set up suitable control charts.
  2. If the specified tolerance is 3.498 cm to 3.502 cm, what is your reaction? Would you consider any action necessary?
  3. The following table shows the operator’s results over the day. The measurements were taken using a comparator set to 3.500 cm and are shown in units of 0.001 cm. What is your interpretation of these results? Do you have any comments on the process and/or the operator?

 

Time

Component 1

Component 2

Component 3

Component 4

Component 5

7.30

0.2

0.5

0.4

0.3

0.2

7.35

0.2

0.1

0.3

0.2

0.2

8.00

0.2

-0.2

-0.3

-0.1

0.1

8.30

-0.2

0.3

0.4

-0.2

-0.2

9.00

-0.3

0.1

-0.4

-0.6

-0.1

9.05

-0.1

-0.5

-0.5

-0.2

-0.5

Machine stopped -tool clamp readjusted

10.30

-0.2

-0.2

0.4

-0.6

-0.2

11.00

0.6

0.2

-0.2

0.0

0.1

11.30

0.4

0.1

-0.2

0.5

0.3

12.00

0.3

-0.1

-0.3

0.2

0.0

Lunch

12.45

-0.5

-0.1

0.6

0.2

0.3

13.15

0.3

0.4

-0.1

-0.2

0.0

Reset tool by 0.15 cm

13.20

-0.6

0.2

-0.2

0.1

-0.2

13.50

0.4

-0.1

-0.5

-0.1

-0.2

14.20

0.0

-0.3

0.2

0.2

0.4

Batch finished - machine reset

16.15

1.3

1.7

201

1.4

1.6

 

This Engineering has been solved by our PhD Experts at My Uni Paper. Our Assignment Writing Experts are efficient in providing a fresh solution to this question. We are serving more than 10000+ Students in Australia, the UK, and the US by helping them to score HD in their academics. Our Experts are well-trained to follow all marking rubrics and referencing styles.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.