Assignment Task:

Task 1 – LO1 – Identify and describe the QS functions under a variety of main contract

A project involves the refurbishment of a retail store. The project is to be carried out without a total closure of the store while refurbishment works are in progress. The store is located in the ever-busy Kowloon City Centre Mall. The refurbishment will be done in 3 phases. The first phase will be the upper floor and half of the ground floor. Whilst refurbishment is taking place in the first phase, the store will continue trading on half of the ground floor. Once works have been completed, the refurbishment will
be completed to the remaining half of the store and trading will continue in the newly refurbished half of the ground floor and the whole of the first floor. The final phase will be to complete the external elevation. This is the best method and will create minimum interference for customers. Phase 3 will be done at times when the store is closed after trading hours.
A (i) As an estimator for the company, study the proposed work method and identify ten (10) factors (from the information presented above) that could significantly affect your tender estimate.
(ii) Discuss in detail how these ten (10) factors will be considered when preparing an estimate for this project.
(iii) On assumption labour for the above project is to be employed directly by both contractor and subcontractor working on the project, discuss in detail different considerations when estimating for the labour.
(iv) Identify and explain key factors that an estimator will need to consider and make allowances for, when estimating for materials on assumption the above project is a lump sum contract.
B (i) Using a past or existing Hong Kong construction project case study compare and contrast in detail operational estimating and unit rate estimating. In your discussion, include advantages and disadvantages of both operational estimating and unit rate estimating as applicable to the project case study (500 word limit)


Task 2 – LO3 – Apply estimating techniques to a range of work tasks for construction projects
A. Using the relevant data provided in the data sheet attached and making reasonable assumptions where data is not provided:
(i) Build up a price for the preliminaries item B in the bill of quantities extract attached.
(ii) Build up a unit rate for item D in the bill of quantities extract attached.
(iii) Build up a unit rate for item E in the bill of quantities extract attached.
(iv) Build up a unit rate for item F in the bill of quantities extract attached


This Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.