Task (100%)
(i) Take off the substructure (inc DPC and Floor) to a proposed house and record all the taking off in an appropriate manner in line with the requirements in the NRM 2. (Do not take off any of the superstructure). (70%)
(ii) Produce a written specification for the substructure works. (20%)
(iii) Produce a query sheet during your taking off process (10%)
SUPPORT RESOURCES
The following resources are available on Blackboard to help you deliver this assignment
: • Full drawings available in A3 and also A4 PDF format – please download and print off a copy
• 3D Flyaround video (MP4) of the proposed development
• 3D Flyaround video (MP4) of a substructure section showing the foundation and floor detail
• Full 3D CAD model for download to your mobile, tablet or laptop to examine the proposal in depth