AD Architecture and Building Construction Management - Architecture Assignment Help

Download Solution Order New Solution
Assignment Task

 

AIM 
Develop the detailing and the design of the core that services all levels including the plant room that you have allowed for in Assignment 1b. Note that the functions of the core change as one moves up the building. The primary aim of this assignment is to familiarise students with the design, services, insulationand finishing of core elements, in particular lifts, lift cores and lift lobbies, male, female and disabled toilets, fire stairs, and plumbing and other ducts or vertical risers as listed below.

 


Ground, First and Second Floor: 

  •  Adjust the central core location as necessary in consultation with tutor
  •  Adjust the central core size if required – the central core does not have to use all 6 car parking spaces
  •  Provide 2 lifts and 1 fire stair in the central core according to the requirements below.
  •  Provide 2 additional stairs, 1 at each short side of the floor plate. Three stairs total
  •  Adjust the stairwell size if required – it does not have to use the full 2 car parking spaces
  •  Lifts and fire stairs in the car parking levels do not need to be finished
  •  Provide for service risers through the car parking levels that connect the office levels and the ground
  •  Car parking levels are naturally ventilated, do not provide mechanical services to these levels

 

Third, Fourth and Fifth Floors:

  •  Adjust the core location as necessary in consultation with tutor
  •  The central core must be located in the centre of the office, and must not be located on the perimeter of the building
  •  Provide 2 lifts and 1 fire stair in the central core according to the requirements below.
  •  Provide male, female and disabled toilets according to the requirements below
  •  Provide services risers as per the requirements below
  •  Except for stair interiors, all surfaces visible to the building’s users in the office levels are to be finished with applied finishes, either battened-off the substrate or with its own steel stud structure. This includes the floor, walls and ceilin

 

 

This Architecture Assignment has been solved by our Architecture Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment Experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.