Assignment Task
 

tudent Written Assessment

  • Qualification Title Certificate IV Building and Construction (common unit of competence for - Building, Estimating and Site management)
  • Unit Title/s Apply structural principles to commercial low rise constructions.
  • Assessment Task Title Assessment task 3
  • Student Declaration I hereby declare that the material herein submitted for assessment is my own work except where specifically acknowledged and referenced.
  • Student Name Student SIS ID Student Signature Date of Assessment Assessor Name Student guide for Written assessment
  • Overview of Assessment The purpose of this assessment is to assess your ability to plan; manage; and coordinate the laying of floor systems.
  • Task/s to be assessed Project -This is a written task of short answers to a case study or a project scenario.
  • Time allowed Unsupervised time allowed to the due date or session as indicated in the subject programme.
  • Location The assessment can be conducted in a classroom at a nominated TAFE SA campus or other location agreed/approved by the assessor
  • Decision making rules To receive a satisfactory outcome for this assessment you must answer all questions correctly to the expected benchmark.
  • Assessment conditions Assessment will be conducted in either an onsite or off-site context.
  • Reasonable adjustment will be made or offered to the student upon request as per TAFE SA assessment policy
  • Resources required Resources required for this assessment are not limited to the list here:
  • NCC 2016 downloadable from the Australian Building Codes Board website.
  • Australian Standards, obtainable from the TAFE SA-online library.
  • Computer access and internet.
  • Office equipment, calculator, photocopier and telephone systems.
  • Technical online reference library.
  • Results/Reassessment Students will be advised of the assessment outcome within 2 weeks from the date of submission.
  • Students will be given one further opportunity to resubmit their assessment, only if their first attempt is found to be unsatisfactory and doesn’t meet the expected benchmark.
  •  
  • ASSESSMENT TASK 3 QUESTIONS
  • Students to note:
  • For completing this task, you will need to have full access to the Port Augusta Police station documentation
  • Access the documents from your TAFE SA Learn portal – course page (CPCCBC4011B) - under drawing section
  • Or follow the TAFE SA Learn – weblink here –
  • https://learn.tafesa.edu.au/mod/folder/view.php?id=459344
  • Please read the scenario given below carefully and answer the following questions
  • Scenario:
  • The supervisor on the project will be off site for the next 2 weeks and the Project manager has instructed you to plan, coordinate and manage the section of the suspended upper floor work spanning across the Comms room, Liaison officer, Reception, and Officer in charge rooms. The floor area is noted on the section details A, D, and E on drawing - 08. You examined the documentation and you discover that you are missing information and documentation on the suspended floor system, not included with the document package.
  • You contact the Architect for the project, and the Architect has issued you with a formal instruction covering the structural details (copy attached below) to enable you to proceed with the work.
  • The details are as follows:
  • Floor slab to be steel reinforced concrete, thickness of 150mm, placed over Bondek permanent formwork over steel floor beams 200UB 25.4.
  • Main slab reinforcement to be N16 bar, both ways in mesh pattern placed with a minimum top cover of 30mm.
  • Shear studs to the UB floor beam at 300 centres.
  • Standard steel plastic tipped bar chairs are to be used.
  • This information is to supplement the section details A,D,E of Architectural drawing 08.
  • You are required to:
  • A. Examine the supplied details and section drawings for the Port Augusta Police Complex.
  • Create a list of five (5) documents, you would require to be included with the plan set to ensure you have all information to construct the suspended floor.
  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  •  
  • From your list above, which documents will you require to assure you that the suspended floor is compliant with the Building Code/ building regulations and industry construction principles?
  • Which industry professionals would you expect to have signed off on these documents?
  • B. Create a table or a spreadsheet that you will use to supervise and manage the construction and completion of the upper floor system according to the building plan and engineering details provided in the contract documents.
  • Your table or spreadsheet must demonstrate:
  • Supply of all materials, ordering, delivery and installation dates.
  • Inspection dates.
  • Subcontractor labour requirements, site attendance and dates.
  • Concrete equipment hire and plant requirements.
  • Formwork materials supply and delivery dates.
  • Formwork labour requirements site attendance and dates.
  • Props and supports hire.
  • Include a column in your spreadsheet to identify the documentary evidence you would require at the various stages of the work to demonstrate compliance with the contract documentation.
  • At the stages of materials ordering and delivery, inspection, and testing you will need to collect documentary evidence which will demonstrate the work has been completed in accordance with the contract documentation. Provide examples of any two (2) of these documents.
  • Upload your completed table or spreadsheet to TAFESA Learn.

 

 


This Engineering Assignment has been solved by our Engineering Experts at onlineassignmentbank. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
    
Be it a used or new solution, the quality of the work submitted by our assignment Experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.