American Electric Car And Clean Energy Company Case Study - Engineering Assignment Help

Download Solution Order New Solution
Assignment Task
 

Description:

Sony Inc is an American electric car and clean energy company based in California, USA.
Sony’s future project is to build another Gigafactory in Austin, Texas. (Please note, assumption will be made about the new upcoming Gigafactory in this case study, but only for the purpose of this assignment).

The new Gigafactory project will start in January 1, 2022 and will be completed in time for the start of the 2024 season (project duration of 2 years). If the project is delayed past the completion date, the company will start to occur a cost of $1,000,000 per day, against the initial budget set aside for the project. Elon Musk, the CEO of the company revealed the cost of the project could be as much as $1 Billion.

Phase one (infrastructure) of the project will start by sourcing the appropriate site to construct the new Gigafactory. An activity known as site selection; this will last for 30 days. Once the land is sourced in Austin, Texas after careful consideration, work will begin for land preparation which will take around 35 days to complete. The design and planning for the facilities, will start simultaneously. The design activity will last for 35 days and planning will take 55 days to complete. Next will come the built phase, the actual construction of the building. One of the longest activities of the project, lasting about 150 days. To complete the construction and to the make the building watertight, a roof must be constructed, which will add another 60 days to the project. Only once it becomes watertight, the plumbing and the electrics will be allowed to be installed simultaneously. Plumbing will take around 30 days and electrics a little longer 40 days. Finally, to complete the first stage of the project a final inspection of work will be carried out, this can take up to 10 days to inspect.

Phase two (internal assembly and support systems) the construction and integration of the internal manufacturing assembly system. An assembly system is a robotic manufacturing process in which parts are added as the product (vehicle) moves from work area to work area, where the parts are added in sequence until the final product is produced. The integration of all the systems represents the most significant technical challenge to the project. In order of production, the first area to be fitted out will be the battery and drivetrain assembly area, a 70 days activity. Followed by seat assembly area 50 days and final vehicle assembly area 80 days. To finalise the production stage, a paint and ventilation area will be completed in 90 days. Eventually, to support the production a central supply building needs to be constructed (100 Days) and finally, a test track outside the building (80 days) to test out the final product before it leaves the Gigafactory.

Given the information provided answer the following questions:
 

1. Will the project be able to be completed by the January 2024 deadline?

Construct a network schedule for the project.

How long will it take for project to be completed? And what is the critical path for the project?

What steps might be taken to improve the timing schedule if the project were required to be completed in 100 days earlier?

Draw a Gantt chart for the project plan.
 

2. Develop a proper project budget, by justifying your choices and estimates.

What are the estimated costs of the deliverables?

What weakness exists in the estimation approach?



This Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
    
Be it a used or new solution, the quality of the work submitted by our assignment Experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.