Angela Gutierrez is a construction project manager with Betta Construction. The company has been in the asphalt construction business for years, focused on paving smaller roads, driveways and parking lots. Looking to 2021, Angela was asked to consider bidding on a new line of projects: multi-use pathways and separated bike lanes.
To improve cycling infrastructure, Municipalities in Southern Ontario have been constructing a growing number of separated bike lines and asphalt multi-use pathways instead of concrete sidewalks. Instead of owning and maintaining a construction fleet, municipalities typically complete these construction projects by tender.
In a tendered road or pathway project, the government announces a tender to build a specific segment of pathway with specifications clearly laid out (including the length, any road crossings, etc.). The government then requests that private companies submit bids to complete the project, along with documentation proving the company is able to do the work. All interested competitors submit these bids secretly and all at once.
The lowest bidder that also meets some technical government requirements (such as having access to a bank loan of a sufficient size, being safety certified, etc.) is awarded the contract. The winning company must pay for all construction costs, and then receives the value of its bid as revenue from the government upon completion. For example, if a company estimates their constructions costs to be $300,000, they might submit a bid of $350,000, so that they expect to make a profit of $50,000 on the contract.
Historical data for projects from municipalities across Southern Ontario are listed in “Betta Construction.xlsx”. The data includes the bid amounts from up to the lowest 5 bidders. Angela has also found the price of oil around the time each project went for tender.
In the region where Betta Construction operates, Angela has identified two projects she would like to bid on. They are listed in the table below:
|
Project ID |
Type |
Length (metres) |
Road/Driveway Crossings |
|
111 |
Multi-Use Path |
1200 |
14 |
|
112 |
Separated Bike Lane |
1400 |
11 |
Assume the price of Oil is $50/barrel right now (you can also use this value as the forecast for the near future). Angela estimates the construction cost of a multi-use path to be $20/metre for labour, and (Price_of_Oil*0.6) $/metre for materials. For example, a 1000 metre pathway with oil at $50 per barrel would cost: $20 + ($50)*0.6 = $50/metre, for a total construction cost of $50/m * 1000metres = $50,000. There is no cost to prepare the bid.
She has a similar formula for the construction cost of a separated bike path: $50/metre for labour and (Price_of_Oil*0.7) $/metre for materials.
In some municipalities, the number of road/driveway crossings might impact the production cost, as they might require reinforced construction at the crossings. However, the requirements where Betta construction operates are not onerous, so Angela has not explicitly included them in her construction estimates.
Angela really wants to win at least one of the two projects, to keep her construction crews busy over the next few months. In addition to the loss of potential profit, she thinks she will have to lay off some staff, then hire new employees when the company finds new work. The cost of training these new staff will be ~$10,000. To be clear: if she does not win either project, she incurs a cost of $10,000.
HINT: While you can make a model that directly predicts the winning bid, you might also consider a model that predicts the winning bid in $/metre. Both have their merits…
Angela is thinking of making aggressive bids, with markups of $25/metre over her cost of construction, typical bids, with a markup equivalent to your prediction in Q2, or conservative bids, with markups of $45/metre over her cost of construction.
HINT: You can use Decision Analysis, Simulation, or your intuition to answer this part. Take care, your recommendation here carries a lot of weight, but it must be consistent with the work you have done in the first part of your report!
Prepare your answers to these questions in a well-organized report. You can answer them in numerical order, or draft up a management style report. Both styles can be effective.
This BU609 - Management Assignment has been solved by our Management Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment Experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.