Subject Code: BUIL1237
Civil Engineering Assessment Answer
Task
Task A:
Identify the different elements of the substructure using Australian Standard Methods of Measurement (6th Edition) (ASMM 6)
- You are required to identify the different elements of substructure based on the ASMM6 using the classification table
- All the identified elements should reflect in the TO list and they should be measured.
Task B:
- Take off quantities for the substructure using the Drawings
- As the first step of taking off, you are required to calculate appropriate girths for taking off.
- Subsequently, you have to take off quantities for each of the items identified in Task A.
- While taking off you have to use ASMM6 concurrently to make sure that you are using the measurement rules appropriately.
- Some of the measurement rules that you must adhere are as follows,
o Use the correct unit of measurements based on ASMM6 for each of the items.
o Identification of depth categories for trench excavation, girth categories of trees, etc.
- Finally, you have to make sure that the take-off quantities are accurate and sufficient to complete the
work.
Task C:
Write comprehensive descriptions for each of the items
- While taking off you are required to write comprehensive descriptions for each of the taking of items.
- These descriptions should include the kind and quality of materials together with the quotes given in ASMM6.
- Further, these descriptions should be clear, concise and should follow an appropriate sequence based on ASMM6.
Task D:
Use the QS paper appropriately
- You have to make sure that all the taken off quantities and descriptions are entered into the QS paper appropriately.
- The QS paper should be clean and tidy for checking with sufficient space in between two different items.
- As a minimum, you have to make sure that the following are done.
o Use of correct column for dimensions and descriptions
o Enter the quantities in m for taken off items in the dimension column
- Finally, you are required to square the quantities for each of the items.
Task E:
Raise queries if any information is missing on the Drawings or on the Specifications
- While taking off it is very common to have unclear or not specified information on the drawings or specifications. In this case, use the course discussion board for Assignment 1 in Canvas to raise queries.
- You are required to follow the course discussion board although you didn’t ask any query.
- The answers given on the course discussion board might be vital to complete the assignment.
- Although the discussion board is not marked you are required to mention all the information extracted from the course discussion board in the query sheet
- Further, any other assumptions you made while taking off should be entered into the query sheet.
- In the end, you are required to submit a comprehensive query sheet along with the submission.
Task F:
Provide a scanned copy of the measurement.
- You are required to get manual measurements if any dimension is not given on the drawing. In this case, you might have to create a scale to get the correct dimension.
- Further, you might be using different color coding to highlight different sections measured.
- All these working drawings should be submitted along as a scanned PDF file.
University: RMIT University
This Engineering Assignment has been solved by our Engineering experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.