Highlights
Scenario:
Assume you are employed by a property development company (client) as a construction cost consultant for their development projects. The company delivered 20 number (in total) residential, commercial, and land development (including infrastructure) projects, during 2017 and 2018. However, out of those 20 projects, the three projects described in Table 1 were completed with significant cost variations from the early-stage construction cost estimates, which were prepared by you in 2015. Company’s investors are concerned about the situation as their decision on investment for each project was mainly based on this early-stage construction cost estimate prepared by the
cost consultant.
Task:
You are required to select ONE of the listed three projects (see Table 1) and prepare a report to the company’s investors analyzing in detail, the factors that influenced on the accuracy of the early-stage construction cost estimate. The report should convey the message that even though you allowed for anticipated cost variations in your early-stage cost estimate, those analyzed factors caused final construction cost to vary significantly, which is beyond your control and beyond the limits of
anticipation.
Your report is expected to include (also refer to ‘general formatting guide’ in this outline):
• Introduction and brief project scenario (suggested around 250 words) You may develop the scenario further from the project details given in Column 2 in Table 1.
• The preliminary estimating method adopted in preparing the early-stage construction cost estimate
(suggested around 250 words)
You are required to assume a suitable preliminary estimating technique for the chosen project scenario and describe how you used this method to prepare the early-stage construction cost estimate, with special emphasis on information availability and assumptions made at the time of preparing the estimate
• Detailed analysis of the chosen factors that influenced the accuracy of early-stage construction cost estimate and caused the final construction cost of the project to vary significantly from it. (suggested around 500 words including a brief conclusion) You are expected to select 2 to 3 factors from the predicted list of factors given in Column 3 in Table 1 for the chosen project scenario.
This Report Writing Assessment has been solved by our Report Writing experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.