You are a Project Manager employed by Anywhere Borough Council (the Client) to project manage the delivery of a new leisure centre located in Ballyhermit, Northern Ireland (“the Project”). The main contractor is Kingsmount Construction Limited (“the Contractor”). An NEC4 Engineering and Construction Contract Option A is in place between the Client and the Contractor. Relevant extracts from the contract are appended to this document.
On 25 January 2022, you received a letter from the Contractor’s lawyers. The letter gives particulars of a dispute which has formed between the Contractor and the Client with respect to adverse physical conditions on the site in which the Project is being constructed. A copy of the letter is appended to this document.
The Employer has asked you to provide a report on what options are available to it in terms of dispute resolution. In your report, you should detail the following:
This Construction Management has been solved by our PhD Experts at My Uni Paper.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.