Construction Management Assessment Answer
Task
Determine the process to apply for a Building Approval to develop and construct a 3 Bedroom 2 Storey Residence with an in-ground swimming pool on a 1400 M 2 Block in a Bushfire Zone, determine Bushfire Attack Level (BAL) in your area.
Prepare a step by step procedure to set up a schedule for the project from the design phase to practical completion. Provide a brief of the project and its program; show an actual program for the project. Provide a procedure should changes occur and how those changes are to be communicated to all site personnel. Provide a procedure as to how you will be monitoring the program/schedule.
Case Scenario:
The Original intention was to subdivide the block. However, the owners have decided to leave the block as it is, move the garage to the western side of the block facing Bell Street.
Although the block is large (1400m2) and appears to have a lot of space, the block has a lot of trees along the western border (which the owner does not want to be removed) and directly behind the existing fibro garage. The trees on the northern (back) and eastern side (Church St) of the block are not to be removed. Scattered around the block are various size Jacarandas and small shrub trees. Refer to the attached drawings AND TOPIC 4 & 5 of the text.
1) Provide a step by step procedure to set up and use the automatic/laser level to calculate the RL (Reduced Level) from the set datum point.
2) From the drawings provided transfer the levels shown on the drawing onto the RL Grid indicating the fall of the land. (i.e. That is to show a graph of the fall of
the land in a cross-section format).
3) Draw in the grid (showing correct measurements) where you would position a free standing double garage with a concrete slab (assuming the existing garage has been demolished). The garage is to be located closer to the western boundary facing Bell Street – incorporate the side and front boundary setbacks. Assume your own design and measurements for the garage.
4) Determine the volume (m 3 ) of the cut/fill required for the site. Using the Cut & Fill Grid provided, sketch how much cut and ill is required to level the slab area of the garage.
5) Complete a written report to the client, providing a detailed description of why it is necessary to cut and fill and remove some of the trees. The report must be clear and concise to justify the costs of the excavation.
Prepare an environmental/waste management plan for the Project
1. Prepare a step by step procedure to reduce erosion and sediment on your site.
2. Prepare a policy and procedure to adhere to the Environmental Legislation and Regulations associated with your project.
3. Prepare a policy and procedure to control the waste and recycling of materials on the site.
PART A - Refer to the attached Site Plan from which you are to indicate on the
drawing where you would allocate the following items for this specific site.
- Storage of Equipment AND Machinery – include rules for the subcontractor
- Materials
- Hazardous Substances
- Placement of Amenities
- Placement of Storage Areas
- Placement of Waste Bins – do not forget your recycling rules.
- Scaffolding
- Crane Access
- Access for Delivery of Materials/Equipment, Vehicle, Concrete Pumps &
- Trucks
- Waste Disposal & Site Cleaning
- Environmental Issues
- Security Provisions
- Hoarding & Fencing
- Services Connection - Telephone, Electricity, Water & Gas
- Parking facilities for site workers.
- Dewatering process after excessive rain
Communications to assist with the construction of this Assessment Task. You may wish to provide further information by searching the Internet or research through other resource material. Should you use any of the material other than your own – ensure you note where the information was obtained from and who the Author is. Do not just copy the information as your own material.
This Management Assesment has been solved by our Management experts at onlineassignmentbank. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.