Causes of Disputes and Their Resolution in Different Construction Industries Compared Against UAE and KSA Construction Industry - Management Assignment Help

Download Solution Order New Solution
Assignment Task
 

Topic: Causes of disputes and their resolution in different construction industries compared against UAE and KSA construction industry.
 

Requirements:
1) all sources should be peer reviewed Journal papers only (no conference papers or magazines)
2) all papers used should be between 2013 to 2021
3) Minimum 60 sources
4) Papers need to be arranged in chronological order (all 2013 papers first, 2014 papers next etc..)

Assignment description:
Write an assignment on the topic above mentioned topic.

Introduction
Frame the research based on what is in the literature review section
Describe what is being investigated and why

Literature review -
1) The causes of disputes can be for different countries Construction industry. However, they should be compared with causes of disputes in KSA and UAE construction industry.
2) The journal papers should be reviewed in a chronological order.
3) The literature review should:
a) make connections between different papers (chronologically).
b) it should explain the purpose of the research conducted (what are the key debates between different researchers and how it changes over time).
c) it should include a very brief explanation of what the findings of causes of disputes in different country’s construction industries are and how they compare to UAE and KSA construction industry.
d) This section should NOT describe the methodology used in the papers

An example: Ibrahim Mahamid (2014) conducted a study to find the key causes of disputes in residential building projects in KSA through use of a ‘questionnaire method’. This survey identified 29 direct and 32 indirect causes of disputes which were evaluated through use of statistical techniques (mean, standard deviation and coefficient of variation). Based on this, the key ‘direct’ cause identified was delays in payment while the key ‘indirect’ cause noted was inadequate contractor experience.
Ghazi Saad A Elawi et al (2016) performed a research study in relation to key factors of project delays noted in road and bridge projects in KSA from an owner’s perspective. The research was performed through data obtained and reviewed from 49 projects relating to infrastructure works from which 10 risk factors were assessed and classified into four subcategories based on underlying nature i.e., owner related, contractor related, consultant related and the residual category ‘others’. Based on this research, the most significant delays cause was identified as ‘land acquisition’ which was classed as ‘owner related’ and is part of the site preparation stage of the project.
Ibrahim Mahamid was concerned with listing causes however, Ghazi attempted classify the type of disputes. Also in 2013, academics were trying to list different sources of disputes and found “delay in payment” to be a top source of dispute. However, in 2016 academics are looking at disputes more broadly and classifying them into different types. The data obtained shows “land acquisition” an owner related disputes to be top source of dispute.

Findings/Analysis
This section should
Compare and contrast different research methodologies, motives, intentions, conclusions
It should talk about the findings of different studies by comparing different journal papers (it can talk about different methodologies used ex. Qualitative or quantitative or both).
Explain how the issue of dispute has affected construction industry in different countries by comparing it to UAE and KSA. Also how has different research on this topic progressed from 2013 to 2021.
It should talk about the cultural differences which affect the construction sector between UAE, KSA and rest of the world.

Discussion
what are the Implications of the findings/ analysis
what are the Short comings of different studies.
what does the findings of literature review mean.

Conclusion
Suggestions for future research
Suggestions to mitigate disputes in future construction projects for UAE and KSA.

 

This Management Assignment has been solved by our Management experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.