Project Introduction
With traffic problems on Melbourne's main route to the airport approaching epidemic levels, much attention has been focused on Tullamarine Freeway. Driving along the Tullamarine Freeway takes almost three times longer in peak hour than it did just over a decade ago, with industry describing the congestion as a "disaster" costing millions of dollars.
• In 2000 it took just over 11 minutes in the morning peak period to travel along Tullamarine Freeway from Bulla Road to Sunbury Road — in 2020 the comparable journey was 36.5 minutes.
• Every work day, 63,000 vehicles use the freeway from Melburne to the airport, which was originally built to carry 20,000 vehicles a day.
• More than 8,000 vehicles use the freeway between 6am and 9am.
• By 2025 daily volumes on the freeway are expected to hit 75,000 (one way from Melbourne to the Airport).
What can be done to boost its capacity? Many ideas have been proposed, including adding additional lanes to the freeway, a railway to connect Melbourne airport to rail network, or even building a new freeway parallel to the existing one.
Option 1 – Railway from Melbourne airport to Sunshine station
A railway has been proposed to connect Melbourne airport to the rail network. This will ease the traffic at Tullamarine Freeway. The proposed railway would have two rail tracks (one for each direction). The line length is 27km, and number of station within the rout has not been decided.
Option 2 – Building a tunnel
Build two tunnels which connect Citylink (from Bulla road) to the airport. The tunnels are around 6km each and will have two lanes each direction.
Option 3 – Widening Tullamarine Freeway
The current Freeway has four lanes each way. Adding additional lanes to the freeway (one extra lane per direction) is the third option.
Option 4 – Do nothing (with regular operation and maintenance, etc.)
Keep current condition with regular operation and maintenance.
Option 5 – Your proposal
You may propose other solutions to solve the Tullamarine Freeway problems.
Instructions
Carry out the infrastructure planning and evaluation for the Tullamarine Redevelopment Project. For stage 1, you need to consider at least four redevelopment options (including do nothing option) and for stage 2, you need to consider at least three options (including do nothing option). Working as a group, you need to carry out in-depth research to evaluate the proposed redevelopment options. Your report has to analyse typical issues including the social, environmental, financial and economic aspects, risks related to each options, demographic analysis, etc. The report needs to come up with a persuasive recommendation.
This CIVE1217 Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.