Assignment Task:

Task:

Assignment 1 (50%)

1 Take off all necessary items and produce a Bill of quantities extract of all necessary items which required for the construction of the steelwork. Both take off and bills of quantities should be word processed and in accordance with NRM2 and to industry standard

30%

2 Produce a structural steel work schedule of Task 1 using a spreadsheet which can be used to measure, record and tally up the totals for each different weight/size.

The schedule should be designed in such a way that it is flexible and if there is a change in quantities it automatically updates. Use the data from the drawing as input data. It is important to ensure a self-calculating live excel spreadsheet is produced and show all build up waste calculations

 

3a Produce a 1000 words academic report, explain the concepts of variation and contractual claims, identifying similarities and differences and providing examples and supporting clauses (JCT, 2016) as appropriate to illustrate your points. Provide a mix of relevant and current references to support your explanation

 

3b An Architect Instruction gave rise to a variation in the groundwork items to which the contractor’s Quantity surveyor is claiming for a new revised rate based on existing bill rates. From the Bill rates on the following page determine the revised rates of the items (A) on basis of analogous or pro rata rates. Clearly showing your logic and all workings.

Assignment

 All in accordance with NRM2, take off all necessary items

 

NRM2 - Structural steel

 All structural steel are measured in tonnes (T), give 2 D.P.

 In practice, the structural steelwork is firstly measured in linear (m) or area (m2) and then convert to weight (kg ? tonnes)

 The weight of structural steel can be calculated from the section size tables

 Or the weight can be calculated by volume of structural steel (m3) multiply by the mass of steel i.e. 7850 kg/m3

 

NRM2 - Structural steel

Items to be measured
 Framed members, framing and fabrication
 Framed members, permanent erection on site
 Isolated structural members, fabrication
 Isolated structural members, permantent erection on site
 Allowance for fittings

 

This Accounting and Finance Assignment has been solved by our Accounting and Finance Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.