CASE STUDY
Cardiff Wales is providing a net increase of 629 bedrooms for student accommodation at the Marble Campus as part of a two-phase £200 million development scheme. The existing buildings on the site (Marble student residences - Site1) have been demolished to allow for the creation of 881 new bed spaces (Phase 1). Alongside, a new health centre and accommodation staff offices within the east side. The planning application was submitted at the end of August 2020 and the project started in November 2021. Vinci Construction has secured the £77m contract. The UK arm of the French firm has committed to build a low-energy-consumption student accommodation building at Marble campus in Cardiff. The three-block project is referred to as Student Accommodation Project 3 by the contractors. 

The new 26,000-square-metre accommodation buildings aspiring to be Passivhaus-certified will be laid out in four, six and eight-bed clusters. The Passivhaus certification means the building will have a low energy requirement/consumption for both heating and cooling. It’s been said that: “When completed, the development will represent one of the largest low-carbon-certified developments of its kind and a first for the university sector in the UK.”  The main part of the construction process will run in the 2022-24 period. Construction work on phase 1 of the new buildings started in summer 2021 and is to be completed and ready for occupation in September 2023.


The Context & Task
You have been selected to write a report on the proposal on MMC for the Cardiff New Accommodation, Wales. As the way forward, the Client has proceeded to appoint you to further develop the detailed report on the construction strategy for the proposed MMC aligned to stage 7 of the RIBA Plan of Work. 

In this context you will write a report with the approach of using RIBA Plan of Work Stage 7: Durability and Maintanance (Long-term use, durability, maintenance, and operational sustainability of the proposed MMC). The MMC Category 5 – Pre-manufacturing (non structural assemblies and sub-assemblies) is being selected for the construction and the materials for the constructions based on the MMC Category 5 are: 

  • Bathroom Pods
  • concrete - slab and ceiling
  • Galvanized steel - window frames, door frames, columns
  • Ceramic tiles - attached to dry wall
  • Lighting - LED Ceiling light
  • wall - insulation wall
  • water treatment - reed bed sewage treatment

 

This Managment Assignment has been solved by our Managment Expert at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing Style. Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. 

You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turn tin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.