CPC40110: Certificate IV in Building and Construction - Management Assessment Answer

Download Solution Order New Solution

TASK

Task 1 - What WHS procedures will you follow when you inspect David and Tara’s site and take measurements?

When inspecting David and Tara’s site to take measurements each state has their own separate WHS procedures and rules regarding workplace prevention of injuries. I will be taking precautionary steps to avoid injuries such as using safe working practices. I shall be aware of risk management procedures and the application of those. I should be knowing methods of identifying and controlling hazards and understanding safety signs and symbols. I should be using protective equipment in accordance with site rules. I should be reporting all procedures as they occur. I should be developing all these skills.

Task 2: Produce sketches and drawings
Task 2 requires you to create two sets of freehand drawings for the clients. All drawings produced for this assessment must follow these instructions.
Drawing 1: Site Plan
In the first drawing you must reproduce the provided Site Plan drawing. You are then to select a space in the allocated zoned area on the site, to add the footprint for the proposed double garage with workshop (6m x 10m). View the site plan at Appendix A.
Your 2D freehand Site Plan drawing must include:
? Scaling at 1:200 on A3 paper
? All services, stormwater pipe work, setbacks, boundaries, driveways and contour lines
? International drawing conventions
? All notations as indicated
? A title block (landscape format)
Drawing 2: Floor Plan - Garage with Workshop
Your next task is to prepare a 2D freehand sketch plan at a scale of 1:50 of your design for the double garage and workshop. Create the stand-alone floor plan on A3 paper. Include the following:
? Double garage with workshop area (6m x 10m)
? All external and internal walls
? Roof outline using a dashed line (i.e. - - - - - )
? Workbench/es should be shown in the workshop
? All doors – i.e. roller door (4.8m x 2.1m), external access to workshop (door = 920mm)
? Natural lighting source (i.e. window/s, skylight, etc.)
? External rainwater tank (2,000 litres) In final preparations, please include the following drawing conventions:
? Dimensions
? Drawing title (‘Garage and Workshop Plan’)
? Drawing labels (i.e. double garage with workshop area 6m x 10m,)
? Title block (landscape format)
? Notation describing each design inclusion (e.g. door, roller door, window, skylight, workbench, rainwater tank)

This Management Assessment has been solved by our Management experts at onlineassignmentbank. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.