CPCCB4011B - Apply Structural Principles to Commercial Low Rise Constructions - Footing System - Structural System - Engineering Assessment Answer

Download Solution Order New Solution
Assessment Task:
CPCCB4011B: Engineering Assessment Answer

Part A: - Compulsory
Footing system - compulsory

  1.  Investigate and describe the soil type/foundation typical of the area
  2.  Detail the footing system that has been designed for the project. Describe the footing systems using text and simple sketches.
  3. Provide photographs or sketches of the footings under construction.

Structural system - Compulsory

  1.  Present photographs and descriptions of the structural framework
  2.  Using simple sketches, describe how the frame supports the load of the building.
  3. Detail the types of connections utilised between the structural members eg footings to columns, columns and walls etc, and explain how they contribute to the stability of the frame.

Part B: Complete 2 of the 3 following topics
Topic 1 Floor system

  •  Describe with the aid of photographs or sketches the floor system that has been used.
  •  Detail the construction sequence to produce this component of the structural element.
  •  Provide photographic detail of the floor under construction nominating the reinforcement etc.

Topic 2 Wall system

 Provide photographs of the wall system(s) utilised in the design of the structure. Sketch construction details not able to be recorded in the photographs.

 Outline the sequence of tasks that details the process of erection of the structural wall system.

Explain, by the use of sketches, how the bracing elements perform their task of resisting wind loads in two perpendicular directions; eg. On the front or back of the building and on the sides of the building.

Topic 3 Services

  •  Investigate how the building/building area controls stormwater. Describe the overall concept and report on guttering, downpipes, pipes, tanks, ‘ponding’ areas and
  • detention/retention tanks.
  •  Detail the services supplied to the building. Show using photographs the connections for, power, water, gas, fire communications etc.
  •  Detail the active and passive fire detection and prevention systems in use. Describe their installation and their functions.

Part C: (For Extra Credit)
Roof system

  •  Identify the structural roof system. Show photographs and describe the components.
  •  Indicate the structural members on a roof plan sketch. Clearly identify the roof embracing elements if appropriate.

 

This CPCCB4011B: Engineering Assessment has been solved by our Engineering experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.