CPCCB5001B - Grigg Road Case Study - National Construction - Engineering Assignment Help

Download Solution Order New Solution
Assignment Task

 

Assessment Task 

Scenario
One of your company’s clients (a developer) is considering buying the site on Grigg Road. The developer has approached your construction company for advice on the viability of the project from a construction perspective.

The site has a current development approval issued by the local planning authority. The approval is based on the commercial development as it is shown on the plans in the Resource Booklet.

There are no building approval plans and therefore there are no fully detailed hydraulic or fire engineering plans. In order to help determine the viability of this project the developer has asked you to compile a report assessing this building against the relevant performance requirements of the BCA including;

  • Section C fire safety,
  • section D access and egress, and
  • Section E services and equipment

 

Report Part 1 - provide a response and explanation for the following
a) Determine the BCA classification for each part of each storey.
b) Determine the Rise in Storeys of the building
c) Determine the Type of Fire Resisting Construction (A, B, or C)
d) Determine the Fire Resistance Level (FRL) required at each level for each of the external and internal walls; the columns, the floors and the roof. You can show your FRL’s in a table showing the different FRL’s for the different levels and the different building members, or alternatively you can highlight the walls directly on the plans and include these as part of your submission.
e) Assess the building regarding the need for Fire Compartmentation and detail how the fire compartments will be achieved if required Measure the floor area of the larger areas and determine if these will need to be compartmentalised in accordance with the building classification and fire resisting type you have determined. This may be shown in a spread sheet or marked up on the plans
f) Determine if the stairs are required to be fire isolated.

 

Assessment Task 2
Report Part 2
Provide a written report of about 250 - 500 words based on the scenario and questions provided below

Scenario

The developer has now purchased the commercial development site on Grigg Road and your company has been engaged as the construction contractor. The building designer has specified a non-combustible metal cladding for the façade of the building. The selected metal cladding has been used extensively in Europe but has not yet been used here in Australia. In order to use this cladding system you are proposing to use a Performance Solution. A performance solution design brief must be prepared to prove that it will comply with the Performance Requirements of the BCA.

 

 

This CPCCB5001B - Engineering Assignment has been solved by our Engineering experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.