Assignment Task:

Task:

Appendix A: Site preparation costs Item Cost
EPA permit $1345 per year

WorkCover – Rating 1 workplace (pays 80% of premium)

$8900 per month
Waste disposal for base stage $1199
Waste disposal for frame stage $298
Waste disposal for lock-up stage $480
Waste disposal for fixing stage $575
Toilets $600 each
Site office (including first aid) $8450
Meal room $4000
Locker room with changing facilities $5250
Planning permit $360
Building permit $425

Things to consider:
 A toilet must be provided for every 3 people working on site. From this, you will need to estimate how many toilets you need to order.
In determining the cost of the EPA requirement and WorkCover, ensure that you take into account the duration of the build.

 

Appendix B: Specifications

Section Specified Materials
Floors 85mm burnished concrete slab 300mm waffle pods

Tiles in the bathroom, laundry and Ensuite

Ceilings 10mm plasterboard
R4.1 ceiling batts (all ceilings)
Eaves 5mm FC sheet, no additional insulation Roof Colorbond? Klip-Lok? Roofing Hi Strength?

Colorbond? paint

Walls, external Brick veneer – Boral Midland Cream Smooth Cored

(230x110x76mm)
Anti-glare foil (0.6/0.9)

 

Appendix C: Project Description
Metharom Construction has been contracted to build a 2 bedroom house at 300 Cherry Blossom Ave, Ascot vale, VIC, 3032. The works are being performed on behalf of Miss Stefanie Abraham who has hired her own architect, and brought her own plans and project documents. The contract is therefore construct only.

It is expected that, generally, works will be performed as follows:
 Phase 1: 28 business days (Planning, permits, site inspections, soil tests, sourcing of materials, and selection of subcontractors, etc)
 Phase 2: 10 business days (Equipment planning, establishment of site access, material deliveries, etc)
 Phase 3: 75 business days (Construction works, including: foundation, frame, roofing, plumbing, insulation, and sarking, etc)
 Phase 4: 17 business days (Finishes, appliances, walls, floors, final checks, etc) Out of consideration for neighbouring properties, building works will occur between Monday to Friday, and between 7:30am and 6pm wherever possible.

 

This CPCCBC4004A Management Assignment has been solved by our Management Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.