Assignment Task

Identify and produce estimated costs for building and construction projects

Welcome. In this unit of competency you will establish the estimated costs associated with the acquisition of materials and labour on building and construction sites, together with the application of relevant overhead costs and margins. Knowledge of physical resource and supplier identification, assessment of the availability of and requirements for skilled labour and application of appropriate codes, regulations and approvals gaining processes is essential.

On completion of this unit, you will be able to:

  1. Read and interpret plans and specifications
  2. Identify and calculate labour costs
  3. Identify and establish physical resource requirements
  4. Develop estimated project costs

 

Specifically you need to demonstrate competence in the following:

  • identify materials required for a project
  • gather information about material supply
  • interpret measurements and calculate quantities and costs
  • plan and allocate human resources
  • identify and cost other related costs, such as those required to meet statutory and planning approval processes
  • produce documentation that meets the timeframes and quality standards established by the organisation
  • communicate effectively, both verbally and in writing

 

Specific task instructions

To complete this task, the student should refer to Mr and Mrs Brown Architectural Plans & Specifications-V4004-619.pdf (CPCCBC4004A_AE_Kn_1of4_SR1) which is available on the OLS.

 

Part 1: Short answerquestions

  1. Refer to Mr and Mrs Brown Architectural Plans & Specifications-V4004-619.pdf (CPCCBC4004A_AE_Kn_1of4_SR1) and answer the following:
  2. What will be the level (relative to AHD) of the finished floor? On which drawings would you find this information?
  3. You have received a quote from the plumber for the installation of the Rain Water Tank for the dwelling and you would like to check the specific requirements for the installation.

State the applicable code and the part within the code that provides the ‘deemed to satisfy’ provisions.

  1. What are the specification requirements for ventilation of the bathroom, ensuite and kitchen?

Explain if the specifications are consistent with the NCC requirements.

(Minimum 100 words)

 

  1. What is the name of the statutory policy document that regulates residential building, development work and land use policy in your state?

 

  1. List six drawings and/or documentation you would be expected to provide for residential construction projects to enable the issue of a Construction Certificate.

 

  1. List two common Australian Standards that may be referenced when considering the estimates for the Mr and Mrs Brown’s project.

Provide a brief explanation of why these standards would have an impact on the costs for this project. (Minimum 20 words per answer)

 

  1. Describe the typical process that is followed in a building organisation when pricing for Sub-Contract trade work. Provide details on each phase of the process. (Minimum of 3 bullet points for each process)

 

  1. Estimate the resource requirements for the concrete driveway in Mr & Mrs Brown’s project. Refer to the Mr and Mrs Brown Architectural Plans & Specifications-V4004-619.pdf (CPCCBC4004A_AE_Kn_1of_SR1) and answer the following questions.

a) What is the RL of the driveway at the garage door?

You will need to apply logical reasoning to determine the answer. Show all your notes.

b) Examine the Mr and Mrs Brown Architectural Plans & Specifications-V4004-619.pdf and estimate the average relative levels of the driveway at the boundary. Show your notes and calculations.

c) Considering your answers for questions a) and b) above, estimate the gradient (rise or fall) from the garage to the boundary. Show your notes and calculations.

d) List the documents that would be used to control costs, meet the construction timeframes and inform associated trades of the required quality standards.

e) Complete the following table to detail a sequence and estimate the contract labour and material resources that would be required to complete the driveway. Do not estimate quantities. The ‘estimated time on site’ can be expressed as a range of time that would be considered reasonable for that task.

 

  1. Referring to the Mr and Mrs Brown Architectural Plans & Specifications-V4004-619.pdf, the concrete slab has been laid and the next stage of construction is due to start.

Identify the next stage of construction, and the appropriate trade contractors involved to carry out that work.

Estimate the minimum number of trade contractors that may be needed and the time taken to complete the work considering the number of contractors chosen. (Minimum 90 words)

 

Part 2: Scenario

The following questions are assessing your ability to react appropriately and solve problems for unexpected situations on a construction site.

Scenario 1:

You are the supervisor on a residential building project and according to the contractual agreement, and as per the construction schedule, the electricians are starting today with the electrical services ‘rough in’. It is mid-morning and you are concerned as to why they have not turned up yet. You are aware of the tight schedule and the follow on trades that will be affected if the work is not completed on time.

a) What are your immediate reactions to solve this issue?

(Provide a minimum of four bullet points)

 

Scenario 2:

After some time you have made phone contact with the electrical foreman and he informs you that they have been delayed on another job and will not be able to get to your site for another three days.

b) Describe the feelings and attitudes that will be affecting the situation, and other factors that you will need to consider when responding to this information to achieve the best outcome. (Minimum 70 words)

c) Describe at least four of your essential follow up actions. (Minimum 10 words each)

 

This CPCCBC4004A-Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing Style. Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered.

You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turn tin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.