Task:

Apply Structural Principles To  Residential Low Rise Construction

Assessment task 1 – Evaluation of Demolition for Residential Low Rise Construction

Choose an actual residential low-rise building, which is typical for your local area and analyse the procedures and stages required to carry out the demolition process. The evaluation should include the following:

  •  A procedural manual for demolition that conforms to legislative & planning & safe work practices.
  •  Explanation of the structural principles that form part of the demolition process of your chosen residential low rise construction and why these principles apply to  Identify the structural components of your project (E.g.: columns, slabs etc.) and explain their effects on the demolition of the structure
  • Identifying areas of potential hazard due to hazardous materials e.g. asbestos cement in roofing, linings, underlay, etc.
  • Disconnection of services, power, water gas in accordance with appropriate standards.
  •  Identification of materials for recovery and recycling ? Use of a consultant (structural engineer) to assess the demolition sequence

Assessment task 2 – Plan the construction project

Prepare a report, from an analysis of the project documentation, which includes provisions for the following:

• Identify and analyse project documentation to assess the adequacy of the structure and the construction practice.

• Identify industry professionals and their roles in the project.

• Assess the requirements of BCA for bushfire or other relevant effects.

• Assess how new and emerging technologies can be applied in the project.

• Prepare a pre-commencement site inspection checklist.

• Produce basic construction programs for a residential low-rise building project, which would be typical for their type in your local area

 

The programs should include: −

  • a list of all on-site activities in relative sequence  all mandatory inspections
  • provide additional details of what these inspections Assess −
  • all other inspections for engineering, finance, progress

Assessment task 3 – Evaluate structural elements

Provide substitute designs for alternative structural elements including members, bracing & tie-down for:

  • Change of stress grade due to the same type of material (e.g. timber)
  • change of wind classification (provide reference to the BCA) ? Change of stress due to a different material (e.g. timber vs. steel)  
  • change of cross-sectional shape

Assessment task 4 – Construction systems (structural components)

Provide details on the construction systems adopted for a low-rise residential construction project and how the construction will be coordinated and managed within the project as a whole:

  •  site evaluation  
  • excavation
  •  footings
  •  walls
  • roof
  • waterproofing
  • general & specific

Assessment task 5 – Construction systems (Non-structural components)

Provide details on the construction systems adopted for a low-rise residential construction project and how the construction will be coordinated and managed within the project as a whole:

  • claddings
  • glazing & joinery
  •  stairs
  •  services
  •  health & amenity, fire, access, air handling
  •  Environmental impacts – e.g. energy efficiency, water recycling ? waterproofing – general & specific

This  Building and construction Project Writing Assessment has been solved by our Building and construction experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.