Assignment Task:

Assessor Instructions: 
This assessment allows the learner to apply their skills and knowledge in their business. The learner should apply this project to their own business activities. If they’re unable to apply this to their business (the activities being undertaken are not aligned with the requirements of the assessment), the learner may use a hypothetical scenario, or work from a previous project. The work must be all the learner’s own. In the case of work being completed by another person in the business, the learner must repeat the task (for example creating a process) in their own words and applying the learnings from the workshop and self-study for this unit.

This project must be completed in full. Responses should apply directly to the learner’s workplace. Where this cannot be completed in the work environment, the responses may be industry related or scenario responses. Learners are to indicate in their responses where they are relevant to their own business, the industry in general or a simulated business scenario.

Learner Instructions:

For this assessment you will be required to demonstrate your ability to:
1. Apply structural principles when planning the erection or demolition of a structure
2. Analyse and plan for the structural integrity of Class 2 to 9 buildings
3. Plan, coordinate and manage the laying of footing systems
4. Plan, coordinate and manage the laying of floor system
5. Plan, coordinate and manage the building of structural wall systems and wall cladding systems
6. Plan, coordinate and manage the building of structural roof systems and roof cladding systems
 
Your assessor will provide you feedback upon completion of this project.
You must complete all of the following activities on the job site and compile evidence of your activities in the space provided or in your own workplace documentation.

Project:
This project is to be completed based on the construction of a Commercial Low Rise Building. You are required to submit copies of the site plans and other relevant documentation as evidence for this project.

This project has 5 parts:
1. Structural Integrity
2. Planning and Specialist Advice
3. Laying of Footings and Floor Systems
4. The building of walls and roof systems
5. External wall cladding

Project 2
1. Identify the main structural principles that apply to the construction of this commercial low rise structure:
2. Consult with the relevant industry professionals to gain advice on the design process and structural integrity of your proposed low rise residential construction. Attach evidence of your consultation, such as emails, notes from meetings, letters or other documentation that will prove the consultation occurred. In the space below, document the advice that you were given on the design process and the structural integrity of your proposed low rise commercial construction.
3. Explain how the specifications for this project are compliant with the NCC (BCA – Volume 1) requirements for bushfire, high wind, earthquake and alpine environments:
4. Conduct a pre-commencement site survey for your worksite. You are required to provide photographic evidence of completing this on site. The images must be uploaded to this question. In addition, you need to upload a copy of your completed Pre-Commencement Site Inspection.
5. Once the footings are laid, document how you checked that they were laid as specified in the plans and specification documentation. Take photos of you checking the footings against the project documentation. Upload your photos here.
6. Assess the concrete slab or bearers and joists specified in the building plans for structural integrity and compliance with the relevant National Construction Code.

Take photographs of each step involved in the below:
• Assessing the concrete slab or bearers and joists specified in the building plans for structural integrity and compliance with the relevant codes.
• Checking the laying of the floor system specified in the building plans for compliance with the project documentation.
For each photograph explain the step that you are undertaking and the outcome of your assessment of the concrete slab/bearers and joists and that the laying of the floor meets the specifications in the building plans and other project documentation.

7. Identify the materials to be used for structural and non-structural walls in the low rise commercial building and explain how you analysed the materials to ensure that they were appropriate for this build.
8. Explain your businesses processes for ensuring the quality of the manufactured roof trusses or hand-cut roofing systems to be installed on your low rise commercial buildings:


This CPCCBC4011B: Business Assignment has been solved by our Business Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.