The aim of this assessment is to assess your skills in monitoring costing systems for complex buildings
Background
To support the role of the builder in being able to produce construction industry documentation, students have access to a professional intranet that provides a simulated building company, RBHoldings. RBHoldings functions as a workplace environment where project-based assessments can be undertaken using industry standard documentation, plans, activities, responsibilities and procedures. The RBHoldings business structure allows simulation of work environments such as, but not limited to, design offices, site offices and construction sites. RBHoldings provides students with relevant documentation that is to industry standard that allows students to experience a professional simulation of a construction office environment. RBHoldings is a fictitious organisation that has been created purely for educational purposes.
Part 1: Practical
Scenario
You are employed by the RBHoldings construction manager Joe Lugarno, in assisting with the planning of a construction tender. The Strathfield Apartments project is a construct only tender with a possible follow up tender submission to the client for a comprehensive property maintenance program.
You will be assisting Joe Lugarno in preparing schedules of project expenditure and develop a range of forecasting strategies to manage cash flow and payments for the project. These activities will prepare you for your role in supervising the finalisation of costs and other project planning of the Strathfield Apartments project.
During the construction phase of the project, you will also maintain continuous checks to ensure actual costs are monitored and compared to the budget and controlled to maintain cash flow as forecasted. On completion of the project, you will prepare final cost reports for evaluation and future project rate adjustments.
To complete this part of the assessment, you must participate in a practical activity that will demonstrate your ability to complete skills-based tasks to industry standards. To do this, you will require access to the National Construction Code
Task 1 - Identify and classify project costs
RBHoldings Construction Manager Joe Lugarno has informed you that they will be identifying project costs and finalising the estimates for four four-storey residential complex, being a Class 2; Type A Construction.
In this task, you will be required to access, read and interpret the building codes of practice, standards, legislation and specifications.
Using the plans and specifications for the Strathfield Apartments project as a basis, you are to complete the following activities:
Access the resource, CPCCBC5002_SR1_Project Planning SpreadsheetV122 and allocate a project specific file name and place in the project file.
2. In this task, you will Identify construction costs and produce accurate estimations from project schedules. For this, you will be using the plans and specifications for the Strathfield Apartments (Boulevard Apartments) project as a basis.
The student is to complete the following activities:
These costs to be listed are separate to those indirect trade construction costs which will be put out to tender.
3. In this task, you will define cost estimates appropriate to contract requirements and accurately translate into the correct cost centres. For this task, you are to assist Joe Lugarno with the project planning activities associated with the Strathfield Apartments project. He has asked you to complete the following:
Access the resource for the Strathfield Apartment spreadsheet CPCCBC5002 Project Planning SpreadsheetV122. Use the preliminary estimate details located on the Preliminary Estimates tab and the RBHoldings master cost codes located in the Master Cost Code tab in the spreadsheets. Allocate cost codes to the construction elements.
Include an 8% overhead and 10% Margin to formulate a contract sum.
All of these documents are located on the CPCCBC5002_SR1_Project Planning SpreadsheetV122.
4. In this task, you are to identify cost centres and correctly incorporate them into a planned project cost network.
You are required to prepare a range of supporting project cost control schedules as follows:
Access the RBHoldings Project Cost Report template from the Project Cost Report tab located in the resource for the Strathfield Apartment spreadshee t CPCCBC5002_SR1_Project Planning SpreadsheetV122. Transfer the summary of trade work estimates and include the cost codes applicable to each item.
Transfer the project estimates costs previously derived in using preliminary estimates to the ‘Original Budget’ column of the ‘Project Cost Report Sheet’.
This Project Cost Report is to remain in the CPCCBC5002_SR1_Project Planning SpreadsheetV122 identified as ‘Project Budget’ with a relevant date and will be used as the template to create successive reports throughout the project’s construction period.
5. You have now completed the initial project budget estimate. The student will carry out a risk assessment and identify possible financial problems that could affect the contract. In this task the student will undertake risk assessments and compare estimated cost with estimated risk.
Your risk assessment should be based on the following information:
You are to complete a Risk Assessment using an appropriate format and provide suggestions to control or make amendments to the relevant budget figures to compensate for the risk realisation.
The Risk Assessment is to be inserted into the project files.
6. Joe Lugarno has asked you to continue to develop a range of cost control and performance analysis tools to assist with the management of the Strathfield Apartments project during construction. You will carry out a range of tasks as listed below.
In this task you will identify project critical points and prepare draft schedules.
6. Access a typical project scheduling tool (such as MS Project, MS Excel, Google Sheets or similar). Use the project scheduling information located in Project Scheduling tab from the resource for the Strathfield Apartment spreadsheet CPCCBC5002_SR1_Project Planning SpreadsheetV122 you will: