Task:
Assessment Instructions
Please refer to both the plans for the Ferguson St Project (Residential) and the Bellbrook Theatre and Professional Centre (Commercial) for the following Assessment tasks.
Note the different building classifications for the two projects:
Water Supply and Storage
Task 1.1
On a photocopy or scanned image of the Ferguson Street project plans supplied in the Resource book: Plans as part of the learning materials, draw the hot and cold water services for Unit 3 and Unit 8. Your answer must be in accordance with AS/NZS 3500.1:2018, BCA Vol 3 (Plumbing Code of Australia), and the Queensland Plumbing and Wastewater Code.
Your drawing should clearly indicate the following information:
You may assume that the council main water supply line is at the back of the units, ie between the unit and the boundary. Copies of all relevant information used on the project must be submitted as part of your answers to allow the assessor access to that information. Use black and coloured pens.
Task 1.2
Task 1.3
Identify the limitations of water storage tanks connected for multi-functional and single function services. How are these limitations addressed?
Task 1.4
Identify two (2) typical water supply faults and one WHS problem that may be encountered on Medium Rise projects. For each fault and problem, identify the actions that are necessary to be taken to rectify the fault and problem.
Hot Water Systems
Task 1.5
Describe the operating principles of at least three (3) types of hot water systems available on the market.
Task 1.6
a) Describe in detail the selection of a hot water system for any project, including factors:
b) Select the correct hot water system for the Ferguson Street Project, according to the plans.
Task 1.7
There are hazards associated with the installation and operation of water supply. Describe when and where the following may occur, and identify the most common methods and devices used to prevent them. Your answer must be in accordance with AS/NZS 3500.1:2018, BCA Vol 3 (Plumbing Code of Australia), and the Queensland Plumbing and Wastewater Code.
Sanitary and Drainage Disposal
Task 1.8
Task 1.9
For the Ferguson Street project, describe the various types of plumbing stacks and how they relate to the number of fixtures associated with those stacks.
Task 1.10
Task 1.11
A Japanese developer client, Ken Watanabe, has a hydraulic design problem with his proposed project. For a Development Approval, he must resolve the disposal of sewage from fixtures situated below the level of the Local Authority (Council) sewer. Assess an acceptable solution that will satisfy the Performance Requirements CP2.1 of BCA Vol 3 (PCA), and AS/NZS 3500.2:2018. The ABCB Publication, Development of Performance Solutions- Vacuum Toilet Systems (in your Assessment resources), will help you answer this question.
Write an email to Mr Watanabe with your recommendation and ask for his approval to proceed. Note that Ken speaks English as a second language. Include a schematic sketch plan/ elevation and specifications of an acceptable device in your email.
Task 1.12
Identify three (2) typical drainage faults and one WHS problem that may be encountered on Medium Rise projects. For each fault and problem, identify the actions that are necessary to be taken to rectify the fault and problem.
Task 1.13
For the Bellbrook Theatre and Professional Centre, identify three (3) possible prohibited discharges. Discuss how the collection, treatment and disposal of these discharges will be monitored. Refer to the relevant Australian Standards for requirements and process.
Task 1.14
Assume that a medium rise building project designed for less than 30 people has no connection to the local authority sewerage drainage system. Explain requirements of a septic or bio chemical unit for the treatment of the sanitary drainage and effluent disposal.
This CPCCBC5009A Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.