CVM80001 - Reinforcement - Project Planning - Steel Fixer - Plant operator - Project Writing - Assessment Answer

Download Solution Order New Solution
CVM80001 - Reinforcement - Project Planning - Steel Fixer - Plant operator - Project Writing - Assessment Answer 
Task:

Define the activities required to construct and backfill around the footing.

 

  • Calculate the quantities of work for each activity. Use units of measure as specified in
  • AS1181-1982 Method of Measurement of Civil Engineering Works etc. (available on- line through Swinburne Library).
  • Determine the work hours required to complete each activity. Note that any activity must have a minimum of two for safety, with typically 4 to 6 workers in a crew Show the assumption that you make, the type and number of workers in your crew and the way you calculate the results. Be guided by the development of work crews in Chapter 9 of the textbook and indicate the productivity rate that you have used.
  • Select an appropriate crew size and calculate the duration of each activity. (Hint: list each different type of tradesperson on a separate line (row)).
  • Using the information in your project planning spreadsheet (below) indicates to the nearest whole day how long you need to allow to complete this project. Assume that there are no wet weather delays.

Description:

This assignment requires you to plan the labor and equipment activities and durations for the construction of a concrete footing for a major piece of equipment in a processing plant. Additional information and frequently asked questions (FAQ) have been included in the second file attachment to this assignment.Quantity measurement and units to be in accordance with AS 1181-1982. Available electronically via Swinburne Library under databases and search Australian Standards / 1181. (note, this file only lasts for 48 Hrs, so you need to print out the relevant sections) Additional Information: The template for a basic Gantt(Bar) Chart has been added to this assignment to assist students to gain an understanding of the sequencing of the plan. We will be looking at scheduling in more detail later however for this assignment you only need to form bars on the chart by colouring-in the number of cells corresponding to the length of the bar for the activity. Don't forget to add you name and ID to the header on the template sheet before you save it.

 

 

This CVM80001 Cost Accounting Assessment has been solved by our Cost Accounting experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

 

 

 

 

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.