Demolition Plan & Services of the Drawings Provided – Assume the Building was Constructed - Management Assignment Help

Download Solution Order New Solution
Assignment Task:

Task:

Using the Drawing Sheets No. 1 & 2 - Demolition Plan & Services of the Drawings provided – Assume the building was constructed in the 50’s so asbestos will be prevalent throughout the building. Prepare a written DEMOLITION PLAN to include the following information.

  •  The location of the site on which the structure to be demolished stands.
  •  The overall height of the structure above ground level and the least distance from the structure to each site boundary.
  •  The type of building (occupancy class), its structural support system and the principle materials of its construction.
  •  The proposed methods of demolition including the number and types of major items of plant.
  •  Disposal/waste management requirements for example proposed method of handling and disposing of demolished materials. Advice may be required from the Local Authority as to their requirements in relation to the disposal of certain material, e.g. asbestos.
  •  The proposed methods of controlling and maintaining access and egress to workplace.
  •  The proposed sequence of carrying out the demolition works and an estimate of the time (in days) it is likely to take to complete all of each of the stages of the work.
  •  Details of the demolition personnel and supervisor for the project, e.g. identities of each person; and their responsibilities, duties, qualifications and skills. All persons involved in a demolition project need to know and understand their responsibilities and duties in relation to health and safety.
  •  The proposed hoardings, scaffolding and fencing and of any overhead sidewalk protection.
  •  Nature, extent and location of public protection required, e.g. fencing, hoardings, barricades, scaffolding, nets, gantries and signage.
  •  Any other plans, illustrations, written documents, or specialist reports as may be necessary to support the proposed methods of work or protective structures.
  •  Traffic management arrangements, which includes managing vehicles and mobile plant hazards in relation to operation at the workplace and interaction with the public.
  •  Dilapidation Report and the outcomes of the report

The above  Management  Assignment has been solved by our  Management Assignment  Experts at onlineassignmentbank. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our experts are well trained to follow all marking rubrics & referencing style.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.