Design a Single-Stage Grid-Connected 1 MW PV System - Engineering Assignment Help

Download Solution Order New Solution
Assignment Task:

TASK:

Design a single-stage grid-connected 1 MW PV system. Consider, the unity power factor system so = 0. Requirements are given below:

i. Use incremental conductance based MPPT system and operate the system at MPP. Rename the simulation file in this case so that I can understand the simulation.

ii. Let’s say the fixed perturbation step size of 0.5 is used in step

(i). Use a step perturbation step size (can be increased or decreased) and show the effect of that perturbation step size on the DC-link voltage waveform. Rename the simulation file in this case so that I can understand the simulation.

iii. In step (i) and (ii) the fixed MPPT sampling time is used. In this case, consider constant perturbation step size and change the MPPT sampling time and show the effects on the DClink voltage waveform and might be in the injected currents as well. Rename the simulation file in this case so that I can understand the simulation.

iv. Consider fixed perturbation step size and fixed sampling time. Change the reference dc-link voltage from MPP voltage to higher voltage and MPP voltage to lower voltage. Run the simulation and show the dc-link voltage waveform for step command dc-voltage. Rename the simulation file in this case so that I can understand the simulation.

v. Include a single-line to ground fault in the system and check the performance of the system during fault. Rename the simulation file in this case so that I can understand the simulation.

vi. We know the problem with the fixed step MPPT. So, use a variable step size MPPT means if we are far away from the MPP then step size is higher but however when closer to the MPP, the step size is lower. Rename the simulation file in this case so that I can understand the simulation. vii. In this case replace the Incremental conductance based MPPT by following MPPT algorithm. You can use the reference voltage as step from ????????????2 to ????????????1. Run the simulation and check the outputs. Rename the simulation file in this case so that I can understand the simulation

This Management Assignment has been solved by our Management experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.