Highlights
Company has been contracted by the Department of Transport and Planning 1 of 3 way bypass for a rural town. Your task in this project is to cover road bypass. The pavement design must comply with Austroads Guide to Pavement Technology. You will need to provide six pavement design options for the bypass, including four options of an unbound pavement with thin bituminous surfacing and two options of an asphalt pavement.
The pavement structure is to be constructed for a design life of 20 years. The current AADT (in 2024) is 5750. The bypass is scheduled to open in 2025. Project reliability is 95%. The traffic load distribution (TLD) is provided in the Pavement Design Data Excel file on LMS. Depending on your student ID, the following parameters must be used:
Note that the above subgrade CBR is the value in its natural state. There is an available option for subgrade CBR improvement. When the subgrade material stabilised with 6% lime, the design CBR was found to increase by 3 (elastic modulus E increases by 30 MPa and Poisson's ratio remains constant).
The following questions must be addressed:
a) Compute the design traffic (NDT) for pavement design.
b) Compute the design number of ESAS (DESA) applicable to a flexible pavement.
c) Work out design solutions for the unbound pavement with thin bituminous surfacing:
Note: the unbound pavement designs must be carried out using the empirical design approach.
d) Work out optimum design solutions for the asphalt pavement, containing asphalt base and a marginal gravel sub-base, for the two conditions of the subgrade materials (subgrade material in its natural state and subgrade material stabilised with 6% lime). The thickness of each pavement layer must be at least 100mm.
Note: the asphalt pavement designs must be carried out using the mechanistic design approach (i.e., CIRCLY).
e) For six pavement designs obtained from (c) and (d), calculate total cost per m2 of pavement and plot a graph comparing the cost of these designs. Pavement costs apply to the materials and construction are included in the Pavement Design Data Excel file.
f) Based on the cost calculation in (e), find the most economical design and draw a sketch that gives full details of the design dimensions and parameters.
Prepare a report of your preliminary designs and recommendations, which should be structured as shown in Table 1.
This Statistics has been solved by our PhD Experts at My Uni Paper.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.