Highlights
Topic:- A Feasibility study and outline design for the redevelopment of the Millennium Mills located on the Southern side of the Royal Victoria Dock and Associated Infrastructure.
Section I - Design Issues
1. Devise a programme in the form of a Gantt chart following the RIBA plan of works for the consultation and design of the project only showing clearly all-time constraints prior to construction.
2. Analyse and provide financial data supporting and justifying cost implications at the design stage only for the project.
3. Specify & discuss how Building Information Modelling (BIM) can be applied to this project.
Section II – Environmental & Stakeholder Management
1. An overview of the environmental issues affecting the construction & operation of the project.
2. A detailed report supporting the process in which public concerns will be addressed.
3. Evaluate how Low Carbon Planning helps to integrate energy efficiency and renewable
energy sources cost-effectively into the new development. (e.g. identify the measures used to
minimize construction waste, embodied energy, and carbon emissions, in low-carbon energy
design and planning)
Section III – Construction Planning
1. The choice of construction methods and logistics for the redevelopment to reduce carbon
emissions and reduce pollution.
2. Discuss Health and Safety obligations and provide detailed method statements supported
with pictorials for the construction of the major elements of the works, these must be project-specific.
3. An outline programme (Gantt chart user-friendly) for the works for the key elements
(manually or software-based) identifying critical activities & resource smoothing opportunities.
Section IV – Economic & Legal Issues
1. Present an economic evaluation of the financing of the Infrastructure and the likely costs.
2. Discuss the geotechnical issues that need to be addressed within this scheme which will affect
the design and cost.
3. Advise the client on the following:
a. The different methods for “Dispute Resolution” if disputes arise?
b. The role of a professional in the built environment (e.g. engineer, architect, project manager, etc.)
Section V - Procurement Methods & Supply Chain Matters
1. Select & justify the most appropriate procurement method for this project in terms of the
contractual obligations. Explore the implementation of the innovative collaborative procurement
approach to de-risk the construction.
2. Analyse the structure of the UK economy in terms of procurement methods & supply chain matters
and demonstrate a critical awareness of the economic role played by the civil engineering construction
industry.
3. Describe how the Quality Assurance System ensures the best practice in managing the construction
of the development. Propose practical measures that can be utilized by contractors to ensure that
the client achieves a project that is ‘fit for purpose’ and best value for money
This Architecture has been solved by our PhD Experts at My Uni Paper. Our Assignment Writing Experts are efficient in providing a fresh solution to this question. We are serving more than 10000+ Students in Australia, the UK, and the US by helping them to score HD in their academics. Our Experts are well-trained to follow all marking rubrics and referencing styles.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.