Assessment Task Part A
• Identify any structural issues with the project design for the footing system and recommend a solution to any issues found
• Describe the process for excavation of the site and construction of the footing system as specified.
• Identify what NCC clauses and what Australian Standards would be used to determine the structural adequacy of the footing system
• List four key items you would check to ensure the footings were constructed to meet NCC and Australian standards for structural adequacy.
• Detail two common faults that can occur when installing footing systems
Describe how the building design addresses damp proofing and termite resistance
How will I be assessed for this task?
For this task you are required to submit the following:
• Completed written report covering each of the requirements listed above
• Written report must be typed, clearly worded and take into account any cultural differences
HERE is an example how it should look like
By using Excel spreadsheet :
Assessment Task Part B
What do I need to do?
You are required to refer to the document PN8168 Plans Pack and PN8168 Soil Report provided to you and complete following tasks:
• Using the project plans, specification and documentation, and using the information below, calculate the total load on the column pad footing at Grid B7.
• Wind load to Roof – 1.2 kPa
• Live Loads to floors in accordance with AS1170 (See table extract in the Learner Guide)
• Reinforced concrete density 2400 kg/m3
• Submit your calculations with your assessment submission.
• Using the determination calculated above and the project documentation, identify whether the footing size is sufficient to meet the structural requirements.
• If the footing is found not to be sufficient, describe what design changes could be made to address this including identifying whether the design changes would be a Deemed to Satisfy or performance solution.
• Write and email to the relevant industry professionals that would be involved in solving the problem. Describe the issue, recommend the design changes you have determined. Request that each professional take the appropriate action (describe the action you need them to take) to ensure that the suggested design changes meet the requirements of the NCC and appropriate standards.
How will I be assessed for this task?
For this task you are required to submit the following:
• Completed calculations clearly showing the working out of the calculations
• Written report outlining if the footing is sufficient and if not, clearly describe what changes would need to be addressed. Your report must be clearly written and formatted
• Email to the industry professional clearly describing the problem and recommended changes. Email must be clearly written, formatted and cultural difference must be taken into account
This Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.