Question 1
Some of the Remote Access Laboratory equipment in the Hydraulics Lab at USQ were designed and built in-house. An experiment to demonstrate and measure the force resulting from a jet of water impacting surfaces is depicted. Use this schematic in conjunction with the following operating requirements,
• 240VAC supplies a PC for the Human-Machine-Interface (HMI), a thermostatswitched 240VAC cooling fan, a 240VAC PLC-controlled pump, a 240VAC to 24VDC
supply and a 240VAC to 12VDC supply.
- 24VDC supplies the PLC, Load Cell Transmitters and Ball Valve V-1
- 12VDC supplies ancillary lighting and PLC E/stop
- The experiment is commenced by starting Centrifugal Pump E1 while Electronically Actuated Ball Valve V-1 is closed. Water Pressure Switch S-1 is used to check that E2 is producing pressure. Together with Float Switch S-5, this confirms that E-2 can be safely operated.
• The Flat Impact Test or the Cup Impact Test are selected by operating either Angle Seat Valves, V-2 or V-3 using a signal from the HMI.
• Butterfly Valve V-4 is opened and the output from Load Cell S-4 is monitored until a steady load is measured.
- A desired anticipated flow rate is set as an input to V-1, sent from the HMI (e.g. 30% of full deflection).
• Once steady conditions are measured at S-4, V-4 is closed until an additional prescribed mass of water accumulates in the Mass Measurement Tank. At this point, V-4 is opened and the length of time that it took to accumulate the mass is recorded by the PLC. This allows a precise calculation of the mass flow rate of the jet of water impacting the surface.
• While the Mass Measurement Tank is filling with the set and measured flow, Load Cell S-2 or S-3 measures the force applied to the surface the jet of water impacts. This data is recorded for subsequent analysis.
• Additional data is collected for various setting of V-1. Once the desired data is collected, V-1 is closed and E-2 is stopped.
• The remote HMI Control uses one PLC using four inputs to produce the data used to calculate the experiment’s results.
• For safety purposes an emergency stop pushbutton isolates AC power via a safety relay (except control power to the PLC) when pressed.
Using CAD software, produce two drawings,
1. The 240 VAC Power Distribution diagram
2. 24VDC Power Distribution diagram.
This ENG1100 - Engineering Assignment has been solved by our Engineering experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.