ENGG2500 : Sustainable Engineering Practice - Energy Systems Project - Engineering Assignment Help

Download Solution Order New Solution
Assignment Task :

1 Introduction 

The council for the town of Scone (Upper Hunter Shire Council) has engaged the con sultancy engineering company you are employed at (UoN Engineering) to identify the optimal energy mix to power consumer loads within their region. Your engineering team is required to write a technical report that addresses three main points: 

1. Identify energy sources in the region that can be exploited to meet the energy requirements of consumer loads; 

2. Select the energy sources, and energy storage technologies, which optimise the sys tem; 

3. In determining the optimality of your solution, consider and quantify (to the best extent possible) the environmental, cultural,  nancial and ethical impacts of your design. 

2 Background Information 

The following background information will help in  nding the optimal energy mix for the town. 

  The council has speci ed that the energy mix can be made up of the following energy sources/storage technologies: 

  •   Fossil fuel1  red generators 
  •   Solar PV or thermal solar 
  • 1Either diesel, petrol (gasoline) gas are options.
  •   Wind turbines 
  •   Hydro turbines 
  •   Electrochemical storage 

  Pumped hydro storage 

  •   The council has only recently been elected and has asked you to keep in mind that they promised during the previous election campaign that at least 50% of electric power would be generated from renewable sources in the newly designed power grid. 
  •  The residents who own and farm land in and around Scone, and who are often a powerful political force in Upper Hunter Shire Council elections, are often highly aware of and concerned with any environmental impacts a ecting the region. 
  •  The tax payers of Scone generally expect council infrastructure projects to provide a high quality service at a low  nancial cost.

 

 Requirements 

3.1 Design 

When designing a solution, the following issues should be at least considered in your report: 

  •  The  nancial cost of your solution, including purchasing costs, maintenance costs and salvage costs/pro ts. 
  •  The reliability of your solution i.e. is there any unmet load at any time during the year, if so how much and which loads does it a ect? 
  •  The environmental cost of your solution, including the impact on climate change.
  • The amount of land required for your solution. 
  •  The appropriateness of your solution to the social, political and cultural environment in the town of Scone.

 

This Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.