Assignment Task

Team or individual: Students are encouraged to do this design project in team of two students voluntarily formed by themselves. However, a single person team is acceptable with neither bonus nor penalty marks. 
Deposit 1
A massive porphyry style deposit located at high altitude in West Papua. Average grade of the deposit is 0.5 g/t Au and 0.8 g/t Cu. The deposit has a UCS of 200MPa and is highly fractured; country rock is similar in nature. The deposit has a large foot print area 500m by 500m and is located 300m from surface and open at depth.

You are required to do a major underground mine development plan and the initial (first) underground development design, specifically as follows.

1. Of the mining methods you proposed for this deposit, decide a most adequate mining method-Sublevel stooping  and further propose an adequate annual production rate. (Key points to address in this part, (1) if the mining method is optimal and (2) if the production rate is adequate.)(5 marks)
2. Propose a mine development plan for the deposit. (Key points to address in this part, (1) if the plan is rational and (2) if the production rate can be facilitated.)(5 marks)
3. Select and Design one of the major underground developments to access the orebody (Key points to address in this part, (1) if the design is rational and (2) if it can facilitate the production rate required.) (20 marks). This part should include:

• Specify the development selected,
• Design its cross section to meet the production rate,
• Verify the cross section to meet the ventilation requirement,
• Excavation strategies and designs (including rock breakage, ventilation, mucking, drainage control and ground support designs), and
• Any other salient points.

Note: students should list any assumptions made.

Your report must be typed and finished in a professional manner with all references acknowledged, and bear in mind that a report such as this would not be complete without drawings, sketches, etc. Please note that COPY and PASTE is plagiarism and CLAIMING CONTRIBUTION TO A TEAMWORK is plagiarism if he/she has not made adequate contribution. 

Useful sources of information include the University library, websites, Mining Monthly and other journals.

 

This ENGIN 5515 - Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.