TASK:
Question 1: Calculate the total drilling per month (15 marks) and drilling rate per minute (5 marks) from the following information: Spacing of the drill holes: 5 m Burden of the drill holes: 4 m Overburden to be removed per month: 200,000 m3 Hours scheduled per shift: 6 Shifts per day: 1 Drilling days per week: 5 Weeks worked per month: 2 Number of drilling units: 2
Question 2: How many drilling units are required to meet the overburden-preparation requirements of a surface mine, if the following information is provided (20 marks)? Spacing of the drill holes: 7 m Burden of the drill holes: 5 m Overburden to be removed per month: 500,000 m3 Hours scheduled per shift: 6 Shifts per day: 2 Drilling days per week: 5 Weeks worked per month: 3 Drilling rate: 20 meters per hour
Question 3: A house located at 300 meters from blast site, needs to be protected. Determine how much maximum explosive charge (20 marks) can be used to protect the house from blasting using square root scaled distance equation. The house can sustain blast vibration level upto 5 mm/s. Assume K: 690.84 and b: 1.65 Determine how much explosive charge can be used to protect the house, if it is 500 meters away from blast site (10 marks).
Question 4: At an urban quarry, a drill and blast contractor has to produce +/-20,000 tonnes of blasted sandstone (2.70 t/m3), which will be fed to a 30 x 42 jaw crusher. The bench height is 15m and they use a hydraulic drill rig with 76mm drill bits. To obtain the required fragmentation, history has indicated that a powder factor of 0.80 or greater is required. Assume an explosive density of 1.2 g/cc. Calculate the following:
a. No. of holes required (10 marks)
b. Total explosives required (10 marks)
c. A building is 500m from the blast. If the maximum mass charge per delay is 250kg, what is the greatest number of shot holes which can be detonated at the same time (15 marks)?
Question 5: Students are to undertake a tunnel blast design for the following conditions:
• Tunnel is 5.5 m wide by 5.5 m high
• Rock is granite with a UCS of 300 MPa
• Drill hole diameter is 51 mm, hole length is 4 m
• The cut is to contain 2 relief holes of 75 mm diameter
• Dry conditions are anticipated, ANFO to be used with a density of 800 kg/m3 and a powder factor of 0.6 kg/m3
• Nonel detonators are to be used
This ENGIN5514 Engineering Assignment has been solved by our Engineering experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.