Highlights
Learning Outcomes
LO1: Plan a design solution and prepare an engineering design specification in response to a stakeholder’s design brief and requirements
LO2: Formulate possible technical solutions to address the student-prepared design specification
LO3: Prepare an industry-standard engineering technical design report
LO4: Present to an audience a design solution based on the design report and evaluate the solution/presentation
Scenario:
You work as a design engineer for a small manufacturing company and have been asked to meet with a potential customer. The company mass-produces Printed Circuit Boards (PCBs) for laptop computers, in factories across Asia, the Far East, and South America. Currently, PCBs are being inspected by hand, but errors and damage have occurred on some production lines.
They require an adjustable jig that can be used in all the manufacturing facilities, on each of the production lines, and can hold a variety of different PCBs. The jig is to be attached to a workbench and it should rotate and swivel to allow inspection of the PCB from any angle and both sides.
Task:
Part 1: Preparing a design specification
With reference to the customer brief above you should produce a design specification, using a standard template, which meets all the customer requirements. In addition, you should present a project schedule for the design of the product. You should consider the importance, sequence, and timing of each activity within your plan and provide illustrations of these.
To determine whether your brief is appropriate you should compare and contrast it with the supplied industry standard specification.
To complete this part, the following elements should also be undertaken:
•Research the characteristics of PCBs used in laptop computers and existing inspection jigs/fixtures/techniques
•Study the customers/stakeholder’s requirements, explaining how these influence the preparation of the design brief
•Explain the use of Critical Path Analysis (CPA) in managing a project
•Evaluate the potential planning techniques available and justify the preferred method.
Part 2: Formulating possible technical solutions
Having completed your design specification, you have been asked to present a suggested design solution, based upon your design specification from Part 1. Your presentation should include an evaluation of at least three different solutions and make the case for your proposed final choice.
To complete this part, the following elements should also be undertaken:
•The use of software to model/simulate/prototype different solutions, based on annotated sketches/CAD models/drawings.
•The use of industry-standard evaluation techniques, such as to cause and effect diagrams, forced decision making or a Pugh matrix.
Part 3: Preparing an industry-standard engineering technical design report
Your manager likes your design proposal and would like you to formally report on this technical solution. You should produce an industry-standard design report, and part of this report should incorporate an evaluation of the effectiveness of this report in terms of whether it will allow the production of a finished product that meets the manufacturer’s and customer’s requirements.
To complete this part, the following elements should be incorporated/considered within your design report:
•An explanation of the role of design specifications and standards
•An assessment of your design solution including an identification of the limitations, compliance, standards, safety and risk management issues.
•Appropriate referencing and citation should be used.
Part 4: Present to an audience a design solution based on the design report and evaluate the solution/presentation
Your manager has reviewed your design report and would now like you to prepare and deliver a presentation to a wider audience of production managers and design engineers. It is likely that the audience may suggest changes/improvements to the given design solution and you should be prepared for this. Your manager wants a debrief afterward and will expect a justification for any further potential improvements following feedback and/or review of the presented design solution.
Your manager will also expect you to explain the possible communication strategies and presentation methods you might have used and reflected on the effectiveness of the communication strategy chosen.
To complete this part, you should also consider/produce:
•The audience identified (see above)
•Opportunities for feedback/Q&A should be considered as part of the presentation
•An e-mail debriefs for your manager.
This Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.