Estimate Quantity Take-Off - Engineering Assignment Help

Download Solution Order New Solution
Assignment Task

 

Assignment – Bill of Quantity take off:
A developer who is a long standing client of your project consultancy company, Ace Projects Pty Ltd, has requested that your company prepare a Bill Of Quantities (BofQ) for their proposed warehouse and office project in Merrylands NSW 2160. The developer will use the BofQ to seek a price from a builder and then use that price in an application for bank finance for the project.
Your manager has asked you to prepare a report, a BofQ table and the supporting calculations for her review before submitting them to the client. You are new to the company and quantity takeoffs are often the first sort of work given to new engineers, so you want to make a good impression.
Your company is keen to prepare a professional BofQ for this valued client.
The developer has provided drawings and the following specification and now requires a BofQ quantity take-off for the building works to ‘lock up’ stage. Lock Up stage includes earthworks, foundations, concrete slabs and carparks, steelwork, precast concrete walls and roof cladding.
The developer has indicated that she is using a new design consultant and would appreciate any comments on the completeness and reliability of the design and drawing.

The following items are to be treated as single line Prime Cost (PC) items in the BofQ (so you can measure each as "1 lot", or for roofing, the total area):
- storm water piping from floor level to the boundary drains,
- 240 volt electrical and data from boundary connection to distribution board in office on common wall with warehouse.
- Roofing including metal deck, flashing, gutters and down pipes to ground level.
- plumbing to amenities,
- Amenities, fixtures, lights, power and tiling.

The finishing trades, painting and office fitout are not included and will be done later by the company that will lease the premises.
The developer has indicated that the division of work in the BofQ should be as follows:
- Preliminaries, site establishment and demobilisation
- Site preparation & setout including clearing, topsoil excavation and cartage to disposal.
- Warehouse building, truck parking apron and driveway crossover
- Office building, and carpark. 

 

This Engineering Assignment has been solved by our Engineering experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.