Assignment Task

 

Q1 

Prepare a fire safety schedule for the building described below based on the requirements of BCA 2019. State any assumptions that you need to make.

High rise office block that constitutes two towers on top of a common 3 level basement carpark. Tower A is 5 storeys with retail on Ground Level, a function centre without fixed seating for 600 people on Level 1 and residential office floors up to Level 5. Tower B contains retail on Ground Level and Level 1, office floors on Levels 2 to 9 and a cocktail bar on Level 10.

Q2 

Use AS 2118.1-2017 to determine the hazard classification for a sprinkler system in building described below (for all areas of the building) and tabulate the design criteria including:

  • the number of sprinkler heads assumed to activate in the area of operation,
  • the activation temperature of the sprinklers,
  • the minimum operating pressure for the sprinklers
  • the discharge density

By calculation, determine the water storage requirements for the automatic fire sprinkler system (the size of the sprinkler tank). You may assume that the water supply to serve the fire hydrant system is required to have an effective capacity of 25,000 L. Use the attached pressure and flow inquiry results for details of the street main supply.

Determine the pressure required at outlet of pump. Assume that the pressure loss for pipes and elbows to distribute water from the riser to the hydraulic most disadvantaged point on each floor is 68 kPa.

The building is located on a university campus and consists of multiple uses as per below:

Basement B1 and B2 - Carpark

Ground Level - Retail (food outlets, Café, news agency, travel agent and book store)

  • Level 1 – Small tutorial rooms
  • Level 2 – Large lecture theatres
  • Level 3 – Library - no stack rooms
  • Level 4 – Cafeteria and Restaurant
  • Level 5 – Offices
  • Level 6 – Offices
  • Level 7 – Offices
  • Roof – Plant rooms

The building has a footprint of 1,900 m2. The slab to slab height on each Level is 3.4 m. Please show all your working and calculations.

 

This Engineering Assignment has been solved by our Engineering experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinctio.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.