Assignment 1 is a report on the factors that influence on the accuracy of early-stage construction cost estimate based on ‘hypothetical’ construction project scenarios given in Table 1. Please note these scenarios are newly designed and will not relate to past assessments.

 

Overall Scenario:

Assume you are employed by a property development company (client) as a construction cost consultant for their development projects. The company delivered 20 number (in total) residential, commercial, and mixed development projects, during 2020 and 2021. However, out of those 20 projects, the three projects described in Table 1 were completed with significant cost variations from the early-stage construction cost estimates, which were prepared by you in 2019 (pre-covid). Company’s investors are concerned about the situation as their decision on investment for each project was mainly based on this early-stage construction cost estimate prepared by the cost consultant.

 

Task:

You are required to select ONE of the listed three projects (see Table 1) and prepare a report to the company’s investors analysing in detail, the factors that influenced on accuracy of early stage construction cost estimate. The report should convey the message that even though you allowed for anticipated cost variations in your early-stage cost estimate, those analysed factors caused final construction cost to vary significantly, which is beyond your control and beyond the limits of anticipation.

Your report is expected to include (also refer to ‘general formatting guide’ in this outline):

  • Introduction and brief project scenario (suggested around 500 words)

You may develop the scenario further from the project details given in Column 2 in Table 1, in order to complete rest of the tasks below.

  • Preliminary estimating method adopted in preparing the early-stage construction cost estimate (suggested around 500 words)

You are required to assume a suitable preliminary estimating technique for the chosen project scenario with justifications for your choice and describe how you used this method to prepare the early-stage construction cost estimate, with special emphasis on information availability and assumptions made at the time of preparing the estimate (detailed calculations are not expected).

  • Detailed analysis of the chosen factors that influenced on the accuracy of early-stage construction cost estimate and caused the final construction cost of the project to vary significantly from it. (Suggested around 1000 words including a brief conclusion)

You are expected to select 2 to 3 factors from the predicted list of factors given in Column 3 in Table 1 for the chosen project scenario.

This Management Assignment has been solved by our Management Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing Style. Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered.

You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turn tin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.