Assignment Task:
Task:
Assessment details Instructions
- Assessment overview The objective of this assessment is to assess your knowledge and performance to:
- identify the most suitable network hardware and software equipment to meet client requirements
- produce appropriate documentation
- identify possible security threats and secure the network
- Assessment Event number 3 of 4
- Instructions for this assessmentThis is a project based assessment and will be assessing you on your knowledge and performance of the unit.
- This assessment is in seven parts:
- Develop network installation plan
- Obtain approval for plans, including security clearance and timing
- Review network cable installations
- Securing a small office network
- Document network software installation procedures
- Finalizing documents, hand-over and approval
- Assessment Feedback – this will be provided after your assessment has been submitted and marked.
- Submission instructions On completion of this assessment, you are required to submit each part as advised in the assessment.
- Ensure you have written or typed your name at the bottom of each page of this assessment.
- It is important that you keep a copy of all electronic and hardcopy assessments submitted to TAFE and complete the assessment declaration when submitting the assessment.
- What do I need to do to achieve a satisfactory result? To achieve a satisfactory result for this assessment all questions must be answered correctly.
- What do I need to provide? A personal computer with internet access
- A word processor e.g. Microsoft Word
- A drawing tool e.g. Microsoft Visio
- What the assessor will provide? Access to the Learning Management System
- Access to supporting documents as listed in the assessment
- Due date and time allowed This assessment is to be completed outside class. It is due in 2 weeks.
- Your assessor may ask for additional evidence to verify the authenticity of your submission and confirm that the assessment task was completed by you.
- Assessment feedback, review or appeals
- Specific task instructions
- The instructions and the criteria in the tasks and activities below will be used by the assessor to determine whether the tasks and activities have been satisfactorily completed. Use these instructions and criteria to ensure you demonstrate the required knowledge.
- Refer to the PlanetG3 project scenario (ICTSAS307_AE_SR1.pdf) when completing this assessment.
- Use the PlanetG3 network installation plan template (ICTSAS307_AE_Pro_3of4_SR1.docx) to document your answers for Part 1 – 5 of this assessment.
- Part 1: Develop network installation plan
- Scenario Continued…
- The network design that you proposed, has been approved by your client PlanetG3. You are now required to develop an installation plan & contingency arrangements for setting up the SOHO network for PlanetG3. Think of contingency arrangements as a backup plan you would follow in case you were unable to perform a task as planned.
- Develop an installation plan for setting up the SOHO Network at PlanetG3 premises. The installation plan should include prioritised tasks & contingency arrangements for installation of components with minimum disruption to client.
- Fill in the following table with the complete list of tasks that you would have to perform in the correct order, priority & backup plans, in order to setup the SOHO network.
- (Your answer must include at least eight tasks, with correct priority and contingency plans.) Use the table given in Part 1 of PlanetG3 network installation plan template (ICTSAS307_AE_Pro_3 of 4_SR1.docx) to document your answer.
- Marking criteria
- Identifies eight installation tasks to be performed when setting up a network
- Identifies the correct priority for all installation tasks
- Identifies backup/contingency plans for all installation tasks
-
- Part 2: Obtain approval for plans, including security clearance and timing
- Scenario Continued…
- The XYZ Corp management, together with PlanetG3 have decided to perform the network implementation on a weekend, _________________________ from _______ AM to _______PM
- To enter PlanetG3 premises on the above suggested dates, special building access arrangements should be made prior to the network installation.
- From XYZ Corp, two network technicians plus you as the network engineer are planning to carry-out the network implementation on PlanetG3 premises. Your client needs to be officially informed of the network deployment plans, including security clearance requirements and actual timings of work to be carried out on the proposed dates.
- Also request for a suitable time for a site inspection prior to the implementation dates to confirm the site layout.
- Mr. Jason Brown is the Manager of PlanetG3.
- PlanetG3 premises is located at Level 1, No: 10, Beverly Street, Sydney NSW 2000.
- Draft a letter, addressing PlanetG3 management to obtain approval for your network deployment plans, including security clearance and timing.
- (Your answer requires at least 120 words but no longer than 160)
- Include your answer into Part 2 of PlanetG3 network installation plan template (ICTSAS307_AE_Pro_3of4_SR1.docx).
- Marking criteria
- Addresses the letter to the appropriate client representative to obtain approval
- Mentions dates and times of when installation would occur.
- Requests for special building access arrangements for those involved in the installation
- Requests for a site inspection to be organized prior to the implementation dates
-
- Part 3: Review network cable installations
- Conduct research into the rules and requirements for installing network cables. Include your answers into Part 3 of PlanetG3 network installation plan template (ICTSAS307_AE_Pro_3of4_SR1.docx).
- Ensure you have cited all references (web links, books etc…) in the Bibliography section of the above document.
- Explain how you would confirm that network cables and connectors have been installed according to industry standards, client requirements and building regulations. (Your answer requires at least 45 words but no longer than 60)
- Mention at least 2 documentation (supplier and standards) you would review to confirm the above.
- Marking criteria
- Researches on industry standards on cabling regulations from correct sources.
- Mentions how to ensure industry standards, client requirements and building requirements can be addressed when performing cable installations.
- Mentions at least one supplier documentation
- Mentions at least one standards documentation
- Includes the correct source information (web or book reference) in the bibliography field
- Part 4: Securing a small office Network
- Conduct research into possible security concepts and technologies relevant to securing a small office network.
- Include your answers into Part 4 of PlanetG3 network installation plan template (ICTSAS307_AE_Pro_3of4_SR1.docx).
- Ensure you have cited all references (web links, books etc…) in the Bibliography section of the above document.
- Briefly mention four possible network attacks that a small office network could encounter along with methods or technologies you can use to prevent them. Use the following table to document your findings.
- Document the procedure of securely configuring a wireless router to prevent from possible network attacks. This document should be in the form of a step-by-step configuration guide with screenshots and clear instructions. (Answer should include approximately 50- 100 words)
- Ensure you have cited all references (web links, books etc…) in the Bibliography section of the above document.
- Marking criteria
- Researches on current network attacks.
- Mentions at least four network attacks.
- Briefly explains attack prevention methods and technologies applicable for each attack mentioned.
- Documents the step-by-step process for securing a router.
- Includes the correct source information (web or book reference) in the bibliography field
- Part 5: Document network software installation procedures
- Document basic procedures for installing and configuring network operating system software for PlanetG3’s server machine. (Preferred software to be installed in Windows Server 2016 - Essentials)
- Include your answer into Part 5 of PlanetG3 network installation plan template (ICTSAS307_AE_Pro_3of4_SR1.docx). Your answer should be approximately 150 words.
- Ensure you have cited all references (web links, books etc…) in the Bibliography section of the above document.
- Marking criteria
- Researches on network software installation procedures.
- Summarises and documents steps of the installation process.
- Includes the correct source information (web or book reference) in the bibliography field
-
- Part 6: Finalizing documents, hand-over and approval
- Include your answers into Part 6 of PlanetG3 network installation plan template (ICTSAS307_AE_Pro_3of4_SR1.docx).
- Document your final network design along with the associated hardware, software and security features.
- Here, you are required to further modify and add more related information to your initial network design created using Microsoft Visio. Ensure that your final network design has the following details:
- Ensure the title of the diagram is called PlanetG3 Final Network Design
- Include your full name and the date you have updated the design in a text box below the title of the diagram.
- Ensure all devices and connections are labelled & hostnames assigned to each device
- Ensure you include IP addressing information for each device along with default gateway & DNS address information as appropriate.
- Include details of the software to be installed & security features to be configured.
- Copy and paste final network diagram into Part 6.1 of PlanetG3 network installation plan template (ICTSAS307_AE_Pro_3of4_SR1.docx).
- As the Network Engineer at XYZ Corp, assume that you have now completed the designing, planning and installation tasks related to PlanetG3 network.
- Describe how you would complete hand-over of the project & secure sign-off from client? (Answer should be approximately 50 to 80 words)
- Document your answer into Part 6.1 of PlanetG3 network installation plan template (ICTSAS307_AE_Pro_3of4_SR1.docx).
- Complete the sample network installation sign-off forms given in Part 6.3 of PlanetG3 network installation plan template (ICTSAS307_AE_Pro_3of4_SR1.docx).
- Marking criteria
- Documents hardware device connections and hostnames in the final network design.
- Documents software information in the final network design.
- Documents security features in the final network design.
- Documents IP addressing details in the final network design.
- Includes the correct source information (web or book reference) in the bibliography field
- Explains how to complete hand-over and secure sign-off from client.
- Completes the network installation sign-off forms provided.
- Part 7: Assessment Feedback
- NOTE: This section must have the assessor signature and student signature to complete the feedback.
- Assessment outcome
- of your submission before attaching the cover sheet and submitting to your assessor for marking.
The above ICT40215 IT Assignment has been solved by our IT Assignment Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.