Assignment Task

Assessment Declaration
This assessment is my original work and no part of it has been copied from any other source except where due acknowledgement is made.
No part of this assessment has been written for me by any other person except where such collaboration has been authorised by the assessor concerned.
I understand that plagiarism is the presentation of the work, idea or creation of another person as though it is your own. Plagiarism occurs when the origin of the material used is not appropriately cited. No part of this assessment is plagiarised.
Assessment overview

The objective of this clustered assessment is to assess your knowledge and performance in the following units:  
For ICTNWK527 you would be required to:
• Monitor and provide resources to a virtual environment
• Create and deploy virtual machines
• Implement changes to virtual machines
• Backup and recover a virtual machine.
For ICTNWK533 you would be required to:
• Plan and design a virtual network, using the available advanced technologies
• Configure the virtual network’s security and storage requirements
• Manage and administer the virtual network at an advanced level.
Instructions for this assessment

This is a project-based assessment and will be assessing you on your performance of the unit.
This assessment is intenparts:
1. Recommended tools, specifications, equipment and software
2. Analyse and document enterprise requirements
3. Presentation – liaise with clients to determine operational requirements
4. Product – plan and design an advanced virtual computing environment
5. Practical – configure and manage the core virtual network
6. Practical – secure the virtual environment
7. Practical – manage virtual machines
8. Practical – configure the virtual environment for high availability
9. Practical – configure the virtual environment to provide live migration
10. Practical – backup and recover a VM
This assessment is supported by the following:
• Observation checklists
• Assessment checklist
• Assessment Feedback

Specific task instructions
The instructions and the criteria in the tasks and activities below will be used by the assessor to determine if you have satisfactorily completed this assessment event. Use these instructions as a guide to ensure you demonstrate the required knowledge in all the units listed in this assessment.
You also need to refer to the following documents in the Cl_AdvVirtual_AE_Pro_2of2_SR_SupportingDocs, zipped folder provided to you.
• ROI_Virtualisation_Report_template(WORD document) – Use this report template to record evidence of performing the tasks in this assessment.
• ROI_Virtualisation_Project_Scenario(PDF file) –Refer to this whenrequired to obtain additional information for the tasks to be performed in this assessment.
• ROI_Virtual_Environment_Specifications(PDF file) - includes technical specifications to be used when configuring Client and Server computers in ROI’s simulated virtual network.
• ROI_Data_Backup_Policy(PDF file) –provides details on the policies and procedures that need to be followed when performing data backups in ROI’s network.
• ROI_NW_server_register(PDF file) –provides specifications of the existing server equipment used in ROI’s network.
• ROI_SOE_V5(PDF file) – ROI’s Standard Operating Environment
• ROI_IT_Proc_Inst_policy_V3(PDF file) – provides details of the policies and procedures that need to be followed when procuring IT equipment and software for ROI’s networked system. 
• Lab_Setup_Guide-Rev-2(PDF file) - provides detailed configuration guidelines for setting up the lab environment.
Evidence
Screenshots
Where indicated in this assessment you will be required to provide screenshots and descriptions as evidence of your work. You are not required to provide screenshots for each step, but screenshots showing final settings and confirming that the functionality was achieved. 
Along with the screenshots you also need to include a short description of the work you have done. This is to show that you understand what is happening.
Please ensure that the screenshot includes the date and time on the PC in the lower right corner. 
ROI Virtualisation Project Documentation
Throughout this assessment, you will be preparing the ROIVirtualisation ProjectReport aimed at your ROI client, Terrence Stewart, ROI Network Manager and IT Support.
Thisdocument is to be a word-processed and written in a business-like manner. You must use theReporttemplateprovided to you(ROI_Virtualisation_Report_template.docx) and include the following common report elements:
a.Title page
b.Table of contents
c.Introduction
d.Version numbering 
e.Conclusion and approval (Sign-off) section
f. Bibliography (References)
g.Page numbers 
Where appropriate you may use point form in this report where an introductory sentence is included. You may also use tables when appropriate.
Submission Instructions
• Rename the file name of the virtualisation report template to include your details as follows: 
o Firstname_Lastname_ROI_Virtualisation_Report.docx
• Include your fullname, student number and date of submission on the header/footer of the report.
• Submit your answer booklet in either .docx or .pdf formats.
Glossary
Throughout this assessment the following industry-standard acronyms will be used:
VM Virtual Machine
VE Virtual Environment
Virtual environment
Please note that some parts of this network will be implemented using virtualisation. Please make sure you read the assessment carefully to ensure this is done correctly.
You assessor will provide you with virtualisation software and virtual machines to install.
Part 1: Recommended tools, specifications, equipment and software
You assessor will provide you with the following virtualisation software, virtual machines and network specifications.
1. Virtual environment
Virtualisation software will be used to simulate stand-alone or networked personal computers in the lab environment:
• Virtualisation Software (Hyper-V will be used as an example in this document)
o Windows Hyper-V – free with Windows Pro, Enterprise or Education.
o VMWare from VMWare.com (VMWare Workstation Player should be free for education or non-commercial usage)
o VirtualBox from VirtualBox.org
• The Virtualisation software should provide a virtual environment that includes access to the following:
o Virtual machines
o vLANs
o vSwitch
2. Network’s technical requirements
The technical specifications relevant to ROI’s network is specified in the following document provided to you inside Cl_AdvVirtual_AE_Pro_2of2_SR_SupportingDocs folder:
• ROI_Virtual_Environment_Specifications(PDF file)
• Lab_Setup_Guide-Rev-2(PDF file) – This is a detailed configuration guide from VMware which can be used to refer when setting up the lab environment.
In addition to the above, refer to the other vendor documentation related to virtualisation technology.
• Vendor specifications and other documentation for software through online access including:
o Windows Hyper-V - https://docs.microsoft.com/en-us/virtualization/hyper-v-on-windows/
o VMWare Docs - https://docs.vmware.com/
o VirtualBox - https://www.virtualbox.org/wiki/Documentation

3. Range of appropriate software
Refer to the following additional software tools.
• Migration tools, Deployment software, Backup and Recovery tools.
• ISO files:
a. Windows 10 Professional, Enterprise or Education
b. Windows Server 2016
•  Word processing Application (e.g. Microsoft Word or similar)
•  Screen capture application (Snipping Tool)
•  Network design software 
o Microsoft Visio
o Draw.io (free tool available online)

Part 2 – Analyse and documententerprise requirements
In this part of the assessment, you will be required to read through a set of enterprise policies and scenario documents todetermine the organisation’s virtualisation requirements and document recommendations and any adjustments to current resources and policies.
1. Carefully read the information provided in the following scenario documents and company policies
• ROI_Virtualisation_Project_Scenario
• ROI_Virtual_Environment_Specifications
• ROI_Data_Backup_Policy
• ROI_NW_server_register
• ROI_SOE_V5
• ROI_IT_Proc_Inst_policy_V3

2. Based on the above, determinethe enterprise requirements for ROI’svirtualised network and document it in your ROI Network Virtualisation Report in section2. Enterpriserequirementsand recommendations using suitable sub-headingsfor the following:
a) Required functionality of the VE
b) Recommendations for adjustment of resources to ensure good performance in the VE.
c) Modifications that need to be done to the current organisational policies and procedures to comply with virtualisation demands/goals.
d) Recommendations for migration tools to convert physical machines to virtual machines.
e) Suggestions on deployment methods to be used.
f)  Recommendations on specific installation media for VM deployment.
g) Recommendation for using automated templates for VM deployment.
h) Recommendations on the virtual environment design strategy that can be used to ensure high availability.
i)  Recommendations on suitable resources for high availability in the virtual environment.
When providing recommendations, you may need to refer to reliable sources of information such as industry-specific or vendor websites and cite your references in the Bibliographysection of your reportusing the APA referencing style.
Please note that further information will need to be built into this report in Part 4 after consultation with the ‘client’ in Part 3.
Part 3: Presentation – liaise with clients to determine operational requirements
To complete this part of the assessment, you will be required to present the information you have researched and developed to a group of clients, answering any questions they might have and displaying positive communication and non-verbal skills.
This presentation will be observed by your assessor.
Your presentation should include:
• A PowerPoint presentation of 10 – 15 slides
• Present yourself in a professional manner
• You will have no more than 15 minutesper presentation to provide the information and answer any questions
Your responses will be used as part of the overall evidence requirements of the unit.
You should refer to the list of criteria in the Observation Checklist for Part 3 to understand what you need to demonstrate in this section of the assessment. This Checklist outlines the assessment criteria used to assess your performance.
Once completed you will need to submit your PowerPoint presentation to your assessor for marking.
Presentation Scenario: Meeting with ROI clients
You have already spent some time understanding theinitial enterprise requirements for the ROI virtualised network and have performed extensive research on the resources required and design strategies that need to be implemented. 
You now need to meetthe ROIinternal client representative, Terrence Stewart, ROI Network Manager and IT Support, to find out more about their enterprise requirements and to obtain their approval before further planning for implementation of the VE.
Attendees to this meeting will includeTerrence Stewart, ROI Network Manager and IT Support. The agenda for this meeting is to discuss;
1.The functionality of the VE including high availability requirements
2.The process of monitoring and adjustment of resources for performance in VE
3.The selection and use of suitable migration tools
4.The selection of appropriate deployment methods
5.The use of specific installation media for VM deployment
6.The use of specific automated templates for VM deployment
7.The VE design strategy for high availability
8.The selection of suitable resources for high availability implementation according to enterprise requirements.
Terrence has a very high level of IT technical knowledge and is very familiar with the network.He will expect you to be able to talk in highly technical terms.
You must keep notes of any advice given by your clients during the presentation as you will need this information to complete tasks later in this assessment.
For your presentation the assessor will organise for a suitable group of individuals, such as another teacher, student or industry representative, to play the roles of the clients;Terrence Stewart, ROI Network Manager and IT Support.
Observation Checklist for Part 3 (Presentation)
The Observation Checklist will be used by your assessor to mark your performance in the previous assessment event type. Use this checklist to understand what skills you need to demonstrate in the role play. The Checklist outlines the assessment criteria used to determine whether you have successfully completed this assessment event. All the criteria must be met. Your demonstration will be used as part of the overall evidence requirements of the unit. The assessor may ask questions while the demonstration is taking place or if appropriate directly after the activity has been completed.

Part 4: Product – Plan and design an advanced virtual computing environment
In this part of the assessment, you will be planning and designing the virtual network environment to suit the enterprise environment.  This will include your virtual network design and functionality, resource selection, the core infrastructure storage environment, administrative strategy, high-availability strategy and backup strategy.
Task 1: Modify previously documented enterprise requirements
Using the information discussed and notes made during your presentationto your ROI clients in Part 3, updatethe enterprise requirements for the ROI virtualised network. Ensure that you include information relating to;
a)The functionality of the VE incorporating the design strategy for high availability requirements
b)Deployment method - select a suitable deployment method to deploy VMs to the ROI virtual network.Explain why you have chosen this deployment method.
c)Resources - identify and select suitable resources required for the virtual environment including the use of currently available advanced technologies. You must include the reasons for your choice of resource. Your resource selection should include;
• Resources that enable good performance in the VE
• Resources required when using migration tools
• Resources relevant for the selected deployment method/s 
• Resources for high availability.
Document these updated enterprise requirements in your ROI Network Virtualisation Reportundersection 2.EnterpriseRequirementsusing suitable sub-headings.
Task 2: Plan and design the core virtual network environment for ROI’s VE
Refer to the up-to-date enterprise requirements from Task 1to planand create adesignfor ROI’s core virtual network environment using an appropriate network design software (e.g. Microsoft Visio, draw.io).
Ensure that your design reflects the strategy to ensure high availability in the virtualised environment.
Include a copy of the core virtual network environment design in your ROI Network Virtualisation Reportunder section 2. Virtual computing environment plans and designsusing a suitable sub-heading.
Task 3: Plan and design the core infrastructure storage environment for ROI’s VE
Refer to the up-to-date enterprise requirements from Task 1 to plan and create a design for ROI’s core infrastructure storage environment. Include the following as part of your plan;
a)Research technical storage specifications and system requirements from virtualisation software vendors to ensure virtual storage meets the organisation’s requirements.Include the results of this research as part of your plan and strategy.
Note: Refer to reliable sources of information such as industry-specific or vendor websites and cite your references in the Bibliographysection of your reportusing the APA referencing style.
b)Create a design for the Core Infrastructure Storage Environment for ROI’s VE.
This needs to include any virtual storage as well asany measures for securing the connection. You may use appropriate design software (e.g. Microsoft Visio, draw.io) to further illustrate/present your design.
Include a copy of your Infrastructure Storage Environmentdesign in your ROI Network Virtualisation Reportunder section 3.Virtual computing environment plans and designsusingsuitable sub-headings.
Task 4: Plan and design the administrative strategies for ROI’s VE
Plan and design the administrative strategies to be implemented in the ROI’s VE. Ensure that you include the following administrative design strategies as part of your plan;
a)Details of the user privileges and permissions for both admin and general user’s accounts.
b)Details of the domain setup to ensure a secure virtual network connection. 
Note: This should be a client-server environment which does not allow for the use of local user accounts. 
c)Details relevant to the single-sign on approach. 
Document the above administrative strategies in your ROI Network Virtualisation Reportunder section 3. Virtual computing environment plans and designsusing a suitable sub-heading.

Task 5: Plan and design backup strategy for ROI’s VE
In this task you will modify organisational policies and procedures, to comply with legislative requirements and the organisation’s goals. 
Scenario:
As part of the transition to a virtualised network the client, Terrence Stewart, ROI Network Manager and IT Support has realised that the policies and procedures, relating to backup and recovery,need to be updated. He has asked that you to prepare a new policy document which outlines the details of how to backup data on the server VMs in the Virtual environment.
As the data stored on a server could relate to private information, there also needs to be considerations about how backup should be stored to comply with the government legislation and guidelines relating to privacy. To clarify this Terrence has direct you to look at the following https://www.oaic.gov.au/privacy/guidance-and-advice/guide-to-securing-personal-information/#s4-taking-appropriate-steps-and-putting-into-place-strategies-to-protect-personal-information. 
Terrence has pointed out that this document needs to be similar in content and tone to the original ROI Data Backup Policy. You may reuse any text that you deem suitable for the new document.
To do:
Create a strategy (e.g. plan/approach) that will apply to backup and recovery of a virtual machine in the virtual network. It needs to include;
a)Policy for backing up server VMs in the VE
b)Information on storage of backups to comply with government legislation and guidelines relating to privacy. All relevant legislation should be listed here
c)The use and integration of a third-party software tool
d)Procedure for restoring a virtual server in the VE.

Note: Please refer to the ROI Data Backup Policy(ROI_Data_Backup_Policy.pdf). Also, refer to reliable sources of information such as industry-specific or vendor websites and cite your references in the Bibliographysection of your reportusing the APA referencing style.
Document the above backup strategy and new data backup policy in your ROI Network Virtualisation Reportunder section 3. Virtual computing environment plans and designsusing a suitable sub-heading.
Part 5:Practical – Configure and manage the core virtual network
In this part of the assessment you will be creating the virtual network to suit the enterprise requirements. This includes creating and deploying VMs in the virtualised environment.
Refer toPart 1 of this assessment for recommended tools, specifications, equipment and software when performing each of the demonstration tasks given below. You may also refer to the ROI Network Virtualisation Report you’ve created in Part 4 for relevant information for relevant enterprise requirements documented.
Task 1: Configure main virtualisation host VM
Install (if required), update and configure the main virtualisation hostaccording to the enterprise requirements. Ensure that you do the following: 
a)Allocate enough resources to this main Host according to the technical specifications.
b)If this is a new installation, name this main host as Host_yournamewhere yournameis your full name.
c)Install, update and configure the main virtualisation host as appropriate.
d)Test your configuration of the main virtualisation host to verify that the functionality has been correctly implemented. 
e)Monitor resources of the virtual environment using an appropriate performance monitoring tool. 
f)Adjust the resources allocated the main Host to ensure performance of the VE. 
g)Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix A - Configuration of core virtual networkusingsuitable sub-headings.
Task 2: Create and deploy VMs using installation media
a) Create and deploy the following VMs inside your Main Host, using the recommended tools and installation media outlined in Part 1.
• ROI-A-01
• ROI-DC
• ROI-SRV-01
• ROI-SRV-02
b) Test your configurationfor each of these VMs to verify that the functionality has been correctly implemented. 
c) Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix A - Configuration of core virtual networkusingsuitable sub-headings.
Task 3: Configure essential services within the virtual network environment
a) Add the following services ADDS, DNS and DHCP in your ROI-DC server VM according to the enterprise requirements. Refer to the technical specifications in Part 1 for detailed instructions.
b) Once you have finished configuring DNS, add all host’s forward lookup record.
c) Test your configuration of the ROI-DC serverto verify that the functionality has been correctly implemented. 
d) Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix A - Configuration of core virtual networkusingsuitable sub-headings.
Observation Checklist for Part 5
The Observation Checklist will be used by your assessor to mark your performance for the previous assessment event. Use this Checklist to understand what skills you need to demonstrate in the practical. The Checklist lists the assessment criteria used to determine whether you have successfully completed this assessment event. All the criteria must be met. Your demonstration will be used as part of the overall evidence requirements of the unit. The assessor may ask questions while the demonstration is taking place or if appropriate directly after the task/activity has been completed.
Part 6: Practical – Secure the virtual environment
In this part of the assessment, you will be securing the virtual environment according to enterprise requirements. This includes configuring user privileges, permissions and enabling single sign-on capability in the virtual environment.
Refer to Part 1 of this assessment for recommended tools, specifications, equipment and software when performing each of the demonstration tasks given below. You may also refer to the ROI Network Virtualisation Report you’ve created in Part 4 for relevant information for relevant enterprise requirements documented.
Task 1: Configure user privileges and permissions
You now need to set-up user privileges and permissionsfor the enterprise environment.As part of this, you will configure the user roles to administer the virtual environment.
Complete thistask according to the enterprise requirements and as planned in the ROI Network Virtualisation Report.To do this:
a) Create an admin user account called ROIUser.Adminin thevclass.local (or testlab.local) domain and add this user account to appropriate administrative roles.
b) Ensure appropriate privileges and permissions for the admin user role have been set.
c) Create a standard domain user account called, ROIUser.yourname (where yournameis your full name) in thevclass.local (or testlab.local) domain and add this account to the appropriate standard domain user roles.
d) Ensure appropriate privileges and permissions for the standard domain user role have been set. 
e) Make ROI-A-01 a client of vclass.local (or testlab.local) domain.
f) Now you are required to configure administration of your virtual environment. Do this by enabling Remote Desktop access on ROI-DC (SRV2016S1 in screenshots) for Administrators. Test this configuration by first logging to the ROI-A-01 (Windows 10 in screenshots) VM using the ROIUser.yourname account, then login again by using the domain admin account.
g) Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix B – Securing virtual environmentusingsuitable sub-headings.
Task 2: Configure single sign-on for vCenter Server Appliance access
You now need to enablesingle sign-on for the virtual network:
a) Configure ROI-SRV-01 (SRV2016S2) and ROI-SRV-02 (SRV2016S3)” to use ROI-DC (SRV2016S1) as a DNS server.
b) Make ROI-SRV-01 a client (member server) of vclass.local (or testlab.local) domain.
c) Make ROI-SRV-02 a client (member server) of vclass.local (or testlab.local) domain.
d) Test your single sign-on configuration to verify that the functionality has been correctly implemented.
e)    Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix B – Securing the virtual environmentusingsuitable sub-headings.
Task 3: Configure vSwitch and VLAN for virtual network security
You need network access to create VLAN and logical boundaries. By doing the following configuration, you are required to maintain the network topology according to the agreed core virtual network design.
a) Use Hyper-V Virtual Switch Manager to create External (or Default Switch) and Private (named SAN in the screenshots) vSwitches.
b) Add two additional Network Adapters to ROI-DC (SRV2016S1). Connect one of these to the Default Switch and one to the Private (SAN) vSwitch. Add one additional network adapter to ROI-SRV-01 (SRV2016S2) & ROI-SRV-02 (SRV2016S3). Connect the additional adapter to the Private (SAN) vSwitch.
c) Create a VLAN in your Private (SAN) vSwitch to separate the storage area network and to implement security.
d) Configured NIC teaming on ROI-DC (SRV2016S1) for the adapters connected to the External (or Default Switch) to improve network performance and network redundancy.
e) Enable Dynamic MAC addresses, DHCP guard and Router guard on both External (or Default) network adapters on ROI-DC (SRV2016S1).
f) Configure your network traffic shaping by configuring minmimum and maximum bandwidths on the Private (SAN) network adapter on on ROI-DC (SRV2016S1).
g) Create an Internal vSwitch with the name Management so that other devices on the external network cannot find the connected deivces.
h) Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix B – Securing the virtual environmentusingsuitable sub-headings.
Task 4: Configure and implement network security for virtual storage connections
In this task you will create, configure and secure the virtual storage connection according to the enterprise requirements.Do the following according to the detailed specifications provided to you:
a) Create the three (3) iSCSI LUNs using C drive (or another drive if more appropriate)as the target drive.
b) Use the Private (SAN) vSwitch from the previous task to create an IP Storage Network to implement security for storage connections.
Note: use the correct IP addressing scheme as per the topology design
c) Configure your vSwitch to host software iSCSI storage for each of the three LUNs.
d) Test your configuration of the virtual storageto verify that the functionality has been correctly implemented.
e) Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix B – Securing the virtual environmentusingsuitable sub-headings.
Task 5: Install and manage local and shared data stores
Configure the following using the LUNs created in the previous tasks:
a) Create datastores within the iSCSI Target. Name the datastores as CSV, DATA and WITNESS accordingly.
b) Allocate the LUNs created in the previous tasks into the above datastores according to your core storage network design plan in the ROI_Network_Virtualistaion_Report.
c) Create data store clusters and resource pools.
d) Demonstrate the task of expanding the datastore capacity by increasing the free space of one of the LUNs.
e) Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix B – Securing the virtual environmentusingsuitable sub-headings.
Task 6: Manage and secure the virtual data storage connections
In this task you will manage and perform further configurations to secure the virtual data storage connections.
a) Configure CHAP to secure the virtual storage connection.
b) Test your configuration of the virtual storageto verify that the functionality has been correctly implemented.
c) Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix B – Securing the virtual environmentusingsuitable sub-headings.
Observation Checklist for Part 6
The Observation Checklist will be used by your assessor to mark your performance for the previous assessment event. Use this Checklist to understand what skills you need to demonstrate in the practical. The Checklist lists the assessment criteria used to determine whether you have successfully completed this assessment event. All the criteria must be met. Your demonstration will be used as part of the overall evidence requirements of the unit. The assessor may ask questions while the demonstration is taking place or if appropriate directly after the task/activity has been completed.

Part 7: Practical – manage virtual machines (VMs)
Refer to Part 1 of this assessment for recommended tools, specifications, equipment and software when performing each of the demonstration tasks given below. You may also refer to the ROI Network Virtualisation Report you’ve created in Part 4 for relevant enterprise requirements documented.
Task 1: Convert computer from Physical to Virtual
Note: For this task your assessor will provide you with a prepared physical machine to convert to a virtual machine. 
In this task you will use migration toolsto convert a physical machine to a virtual machineaccording to the enterprise requirements.
Migration Tools may include (but are not limited to):
• Microsoft Virtual Machine Converter 3.0 - https://www.microsoft.com/en-us/download/details.aspx?id=42497
• Disk2vhd v2.01 - https://docs.microsoft.com/en-us/sysinternals/downloads/disk2vhd
• vCenter converter version 6.2.0.1
To do this:
a) Using the migration tool, convert the supplied physical machine to a virtual machine. Call this VM ROI-Convert. Place this virtual machine inside your virtual environment.
b) Ensure that youfollow the specifications set out in Part 1 and your ROI Network Virtualisation Report.
c) Test your configuration of ROI-Convertto verify that the functionality has been correctly implemented.
d) Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix C – Managing virtual machines usingsuitable sub-headings.
Task 2: Implement changes or reverse virtual machine using snapshots
Perform research and document the process of taking snapshots of VMs. This is done to reverse or implement changes to the VM. You may research on one or more virtualisation platforms that allow for this process and explain relevant details of the process. 
Ensure that you do the following:
a) Demonstrate the processof creating and managing VM snapshots to revers or implement changes to a VM.
i. Using your Virtualisation Software take a snapshot (or Checkpoint) of the VM called ROI-A (Windows 10). Call this snapshot ROI-A_AEST. Configure this snapshot to include a description of 'ROI-A time Zone AEST'.
ii. Modify the Time Zone on the VM ROI-A(Windows 10) to be Pacific Time (US & Canada).
iii. Again, using your Virtualisation Software take a snapshot/checkpoint of the VM called ROI-A (Windows 10). Call this snapshot ROI-A_PTUSC. Configure this snapshot to include a description of 'ROI-A time Zone PTUSC'.
iv. Use the ROI-A_AESTsnapshot to reverse the changes totheVM called ROI-A (Windows 10) VM. Verify that this has been done by checking the time zone on ROI-A VM.
v. Use the ROI-A_PTUSC snapshot to implement the previous changes toROI-A VM (Windows 10). Verify that this has been done by checking the time zone on ROI-A VM.
b) Provide screenshots as evidence of performing the above tasks of reversing a VM to its original state after implementing the changes to it in avirtual environment.
c) Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix C – Managing virtual machines usingsuitable sub-headings.

Task 3: Creating and deploying virtual machinesusing templates
In this task you will create and deploy a VMusing templatesaccording to the enterprise requirements. You will do this as follows:
1. Using your Virtualisation Software, create a template of the ROI-A(Windows 10) VM and call it Win10_Client_Template.
2. Configure this template as follows:
a. Verify that Generate a new security identity (SID) is selected
b. Set yourself as the Ownerby entering yourname (where yournameis your full name)in the Registration Information
c. Verify the Computer Name is set toUsethe Virtual Machine name
d. Ensure that the password is set to 'ROI-VN1!'
e. Verify that the Time Zone is set to Australian Eastern Standard Time.
3. Use this template to deploy a VM called ROI-Bwithinthe Host virtualisation environment.
4. Verify this functionality by checking the computer name and timezone for ROI-B VM.
5. Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix C – Managing virtual machines usingsuitable sub-headings.
Observation Checklist for Part 7
The Observation Checklist will be used by your assessor to mark your performance for the previous assessment event. Use this Checklist to understand what skills you need to demonstrate in the practical. The Checklist lists the assessment criteria used to determine whether you have successfully completed this assessment event. All the criteria must be met. Your demonstration will be used as part of the overall evidence requirements of the unit. The assessor may ask questions while the demonstration is taking place or if appropriate directly after the task/activity has been completed.
Part 8: Practical – configure thevirtual environment for high availability
In this task you will configure the virtual machine environment to ensure high availability, according to the recommended tools, specifications, equipment and software outlined in Part 1. You may also refer to the ROI Network Virtualisation Report you’ve created in Part 4 for relevant enterprise requirements and planned design strategies for High Availability (HA).
a) Create a cluster enabled for High Availability (HA) called ROI-Compute-01.
b) Add both member server VMs, ROI-SRV-01 (SRV2016S2) and ROI-SRV-02 (SRV2016S3)to the Cluster.
c) Test your high availability configuration to verify that the functionality has been correctly implemented.
d) Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix D – Configuring High Availability (HA) in the virtual environmentusingsuitable sub-headings.
Observation Checklist for Part 8
The Observation Checklist will be used by your assessor to mark your performance for the previous assessment event. Use this Checklist to understand what skills you need to demonstrate in the practical. The Checklist lists the assessment criteria used to determine whether you have successfully completed this assessment event. All the criteria must be met. Your demonstration will be used as part of the overall evidence requirements of the unit. The assessor may ask questions while the demonstration is taking place or if appropriate directly after the task/activity has been completed.
Part 9: Practical – configure virtual environment to provide live migration
In this task you will configure the virtual machine environment to provide live migration. Ensure that you do the preparation tasks given below first before perfoming the demonstration tasks for live migration.

Preparation tasks: 
1. Ensure that you have at least one Windows 10 VM created in one of the member servers: ROI-SRV-01 (SRV2016S2)&ROI-SRV-02 (SRV2016S3)
2. Name the VM as Win10-01 and ensure it is powered on.

Demonstration tasks: Perform live migration of VMs
Perform the following tasks to demonstrate live migration of Win10-01 from ROI-SRV-01 (SRV2016S2) to ROI-SRV-02 (SRV2016S3)and back from ROI-SRV-02 (SRV2016S3)ROI-SRV-01 (SRV2016S2).
a) Migrate VM Win10-01 from ROI-SRV-01 (SRV2016S2)toROI-SRV-02 (SRV2016S3) while the VM is running.
b) Migrate VM Win10-01 back from ROI-SRV-02 (SRV2016S3)toROI-SRV-01 (SRV2016S2) while the VM is running.
c) Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix E – Provide live migration capability in the virtual environment usingsuitable sub-headings

Observation Checklist for Part 9
The Observation Checklist will be used by your assessor to mark your performance for the previous assessment event. Use this Checklist to understand what skills you need to demonstrate in the practical. The Checklist lists the assessment criteria used to determine whether you have successfully completed this assessment event. All the criteria must be met. Your demonstration will be used as part of the overall evidence requirements of the unit. The assessor may ask questions while the demonstration is taking place or if appropriate directly after the task/activity has been completed.
Part 10: Practical – backup and recover a VM
In this task you will back up, and recover a virtual machine using script files and by using third-party tools. 
Task 1: Use PowerShell scripts to backup user data
In this task you will back up, and recover, data on a virtual machine using a script file. You will do this as follows:
a) Create a PowerShell script to backup User data (i.e. C:\Users), on the ROI-A VM, to an alternate location, such as a network share or external drive.Ensure you include documentation in your script and that your script is well structured, has correct syntax and is accurate.
b) Test this script to ensure it functions as required. 
c) Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix F – backup and recovery of VMs in the Virtual Environment usingsuitable sub-headings.
Task 2: Usethird-party tools to backup VMs
a) Install a third-party backup tool/s in your Host or one if your VM Hosts (ROI-SRV-01 or ROI-SRV-02) that would allow for VM backups and recovery.
Note: Refer to the ROI’s data backup policy you’ve updated in the ROI Network Virtualisation Reportand install the third-party tool that you’ve already researched on previously.
b) Perform backup of any of the Windows 10 VMs (ROI-A or Win10-01) using the third-party tool.
c) Append the word ‘backup’ to the name the backup of the VM. (e.g.ROI-A-Backup or Win10-01-Backup).
d) Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix F – backup and recovery of VMs in the Virtual Environment usingsuitable sub-headings.
Task 3: Usethird-party tools to recover VMs
a) Delete the original Windows 10 VM (ROI-A or Win10-01).
b) Using the backup created in the previous task, restore the original Windows 10 VM.
c) Verify that Windows 10 VM has been correctly restored and that all previous functionality is still in place.
d) Log your actions, configuration and testing process, including relevant screenshots in your ROI Network Virtualisation Reportunder Appendix F – backup and recovery of VMs in the Virtual Environment usingsuitable sub-headings.
Observation Checklist for Part 10
The Observation Checklist will be used by your assessor to mark your performance for the previous assessment event. Use this Checklist to understand what skills you need to demonstrate in the practical. The Checklist lists the assessment criteria used to determine whether you have successfully completed this assessment event. All the criteria must be met. Your demonstration will be used as part of the overall evidence requirements of the unit. The assessor may ask questions while the demonstration is taking place or if appropriate directly after the task/activity has been completed.
 

This IT/Computer Science Assignment has been solved by our IT/Computer Science Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.