ICTNWK305 : Install and Manage Network Protocols - Engineering Assignment Help

Download Solution Order New Solution
Assignment Task :

Assessment tasks: 

Task 1

Write a detailed description of the client's requirements

  •  The network design should allow for up to 510 staff per department.
  •  Four department: Sales, Operations, Management, and Exploration.
  •  The management department's server must not be accessible from the other 3 departments but the management department's staff must have full access to the other 3 department's networks. All hosts, including all servers, require internet access.
  •  Configuring an E1 service with Telstra at the head office and one for the branch office.
  •  Plan to install a non cisco router at the head office end of the link in a few months.
  •  The NBN will be rolled out in the area soon.  

 

 The head office uses the 172.20.0.0 network for its private addresses. 

  •  Head office requires you to use the 172.16.0.0 network for private addresses.
  •  Make sure the data cabling they are planning to install is suitable for our requirements.
  •  Submit a network design proposal with a fully costed bill of materials and a network diagram.
  •  Head office requires a remote login to the switches and router. IP address should be assigned dynamically. 
  •  Need switch device for 48 PC's and 1 server per department. 
  •  Supply the cables and connectors as required. 
  •  Configuring both ends of the WAN link.  
  •  Planning to put in a wireless network to do a wireless site survey

 

 

Task 2

Write a detailed description of the network you will provide including security and WAN functionality

 

Task 3

Create a fully costed bill of materials for your submission to Western Mining. Create a second copy for your own use and include the vendor for each item.

 

Task 4

Document the IP addressing scheme and device naming scheme. Explain why it is important to document this kind of network information.

 

Task 5

Create a work breakdown for the network installation and implementation.Include contingency plans in case the required network equipment is not available.What other equipment could you use to do the job?

 

Task 6

Refer to the manufacturer's handbooks for the Cisco 2811 router and 2690 switch.List the potential safety hazards and recommended precautions associated with these devices.

 

This Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.