International Journal of Engineering Research & Technology (IJERT) - Engineering Assignment Help

Download Solution Order New Solution
Assignment Task

 

Abstract—The transmission of electrical energy from  source to load for a distance without any conducting wire or  cables is called Wireless Power Transmission. The concept of  wireless power transfer was realized by Nikola Tesla. Wireless  power transfer can make a remarkable change in the field of the  electrical engineering which eliminates the use conventional  copper cables and current carrying wires. Wireless power  transmission has been achieved previously by using AC supply or  through charged batteries. In this project renewable energy has  been used as the source for wireless power transmission. As the  output from the renewable energy sources is low, we have to use  a suitable step-up converter. The DC output voltage from the  solar cell is boosted using a high step-up converter and it is  converted to oscillating signals. These oscillating signals are the  amplified by using an amplifier and then fed to transmitter coil.  By operating at resonant frequency and by achieving good  coupling between the transmitter and receiver coil setup, the  electrical energy gets transferred from transmitter coil to the  receiver coil due to magnetic resonance between them. The  transferred energy is converted back to DC using rectifiers and  given to the DC load. The proposed wireless power transmission  system is validated and verified using MATLAB/SIMULINK. 


This Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment Experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.