Interpretive Geological Cross-Section - Foundations and Stability - Engineering Assignment Help

Download Solution Order New Solution
Assignment Task :

LNG Site Assignment
In this assignment you will assess the ground conditions of your cross-section based on three drill holes including: foundation and slope stability conditions, excavatability and potential for construction material. In addition to lithology (rock type) there is a log of the strength and RQD in the drill holes. Be aware there are many gaps in the strength and RQD data record. In most cases you can assume the value to be zero if it is not provided.

Background: The project data is typical of the site preparation of a major LNG facility.
Part 1 – Interpretive Geological Cross-section

Using the same methods as given in Assignment 1A (Melbourne Interpretive Geological Cross-section) complete a cross-section for the three drill holes allocated to you from the NWLNG database. The drill holes are 50 m apart and should be presented in order of lowest number on the left side of the crosssection. Use a vertical exaggeration of 10. Present the cross-section in the same format as required  


Part 2 – Foundations and Stability
You will make an assessment of the geological conditions that would be encountered in the base and cut slopes of a trench excavation. You will not actually design a foundation or undertake design calculations.
Scenario: The site requires excavation to a depth of 5 m above sea level. The excavation is centred on your middle drill hole. The base of the trench excavation is 15 m wide. The cut slopes at each side of the trench can be 2:1 or 3:1 (H:V). The steeper slope would be recommended if the slope is mainly in sound rock and the shallower slope would be recommended if the slope is mainly in soil or unsound rock.

The slopes can be stabilised temporarily against erosion by placing hard rock fragments against any soft rock or soil exposed on the slope. Mark the location of these stabilisation works on your cross-section graphic.
Instructions: On a copy of your cross-section graphic from part 1, illustrate the trench excavation floor and show the recommended slopes for the sides of the trench. 

 

This Engineering Assignment has been solved by our Engineering  Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.