Objective
This work will involve the development and calibration of the RORB model for the Inverbrackie Creek catchment, as well as its application to obtain the required design flows. In addition, the calibrated RORB model is to be used to assess the impact of the stormwater runoff from the proposed mine site on the 1:100 year design hydrograph at: (i) the point where stormwater from the mine site is discharged into Inverbrackie Creek, and (ii) the gauging station.
The final task in this phase is to compare and contrast the multiple estimates of design flows at the Inverbrackie Creek gauging station, with the aim of recommending final values for practical work.
Tasks
1. RORB model development (calibration and validation):
(i) Division of catchment into appropriate sub-areas and identification of nodes
(ii) Development of RORB catchment file for calibration (fit) runs
(iii) Selection of storm events (rainfall and corresponding runoff data) for calibration and validation (iv) Determination of the “best” RORB model parameters (i.e. model calibration)
(v) Testing (validation) of the calibrated RORB model
(vi) [Masters only] – undertake split-sample validation (where you switch the calibration and validation periods and re-do the analysis) and comment on the results
2. Determination of 1:10 and 1:100 year design flows at gauging station, including the impact of the mine site (25% of the marks)
(i) Appropriate alteration of RORB catchment file
(ii) Input of appropriate IFD data for Inverbrackie Creek catchment
(iii) RORB design runs for 10 and 100 year return periods. At a minimum, this should be done for a range of design durations and temporal patterns as specified in ARR, but potentially could include Monte Carlo Analysis on a wider range of inputs for the design runs
(iv) Choice of 1:10 and 1:100 year design hydrographs and peak flows
(v) Determination of impact of mine site on 1:100 year design hydrograph at discharge point and gauging station. This will require:
(a) Appropriate alteration of RORB catchment file
(b) RORB design runs for 100 year return period for a range of design durations and temporal patterns
(c) Comparison to results without the mine site
This Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.