Assignment Task:

Task:

Q1. Life Cycle Assessment (LCA) (20%) Consider a building with a dimension (10+N*0.5)*(7+N*0.6) m2 for ID ending with 0-3, (5.5+N*1.0)*(3+N*0.8) m2 for ID ending with 4-6 and (5.5+N*0.5)*(3+N*0.6) m2 for ID ending with 7-9. N is the last digit of your ID. This is a university building. Provide a sketch similar to the one provided in the workshop hand out (hand drawn sketch is fine). Perform life cycle assessment similar to the workshop assignment. In your LCA calculate the total material/energy/water requirement for construction and operation. In your calculation assume the building will be used for 8 hrs per day during week days. Water requirement is 10 l/person/d. The number of people using the building is (30+N*2). Materials used for the building is similar to that in the workshop. Other materials can be assumed as necessary. From your learning experience in sustainable systems and your preliminary calculations find a material that need to be replaced to achieve the maximum reduction in CO2 emission from the building. Present the information in a report as the first part as given below: Your report should include

a) Executive summary (2%)

b) Introduction: (2%) Problem definition as an introduction (i.e. service wanted, service life and two alternatives and why you chose these alternatives) and briefly describe (flow chart is fine) the procedure recommended by the ISO to conduct LCA Include the functional unit

c) Life cycle inventory: Include the following and any other necessary information. (4%) Provide the sketch of the building, Assign materials to each major elements of the building including that of suggested modification above for the alternative Estimate weight/volume of each component for both alternatives, include the life of each material etc. (present the material data in Tabular form). Calculate the amount of water and energy use during the use phase of the building.

d) Life cycle impact assessment: (5%) Include the following and any other relevant information A balanced material flow diagram for each alternative. Perform the LCA and provide CO2 emission in Tabular form. Provide sample calculation for each alternative. Estimate if any other aspects of CO2 emission is controlled by your modification for alternative. Include the CO2 emission from the water and energy use during the use phase of the building. Use the document provided under workshop 5 for CO2 emission or other relevant document

e) Life cycle interpretation/analysis (4%) Identify the hotspot, evaluate the best of the two evaluated alternatives Remedial measures for the identified hot spot of each alternative and the feasibility of improvement

The above  Management  Assignment has been solved by our  Management Assignment  Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.