MN5617: System Modelling and Simulation - Report Writing - Engineering Assignment Help

Download Solution Order New Solution

Assignment Task

Learning Outcomes

  1. Critically evaluate and implement principles of systems approach and analysis.
  2. Describe, critically evaluate and appropriately apply manufacturing concepts to real world industrial systems and to design, plan and solve arising problems that day-to-day management of such systems encounter.
  3. Develop the required skills for modelling, simulating and critically analysing performance of deterministic and stochastic systems.
  4. Acquire the skills to recognise the elements and rules governing supply chains/logistics and reverse logistics for better management and engineering of these systems.
  5. Apply key tools and techniques for planning and critically evaluating the design of enterprise systems
  6. Modelling of interactions and negotiations between components of enterprise systems
  7. Demonstrate integrated modelling of key processes within manufacturing systems
  8. Use simulation and optimisation techniques to identify improvements for Enterprise integration
  9. Preparation of written reports
  10. Critically evaluate a range of complex scenarios and make informed decisions.
  11. Exercise a high level of initiative and personal responsibility

 

Every year the assignment for Systems Modelling and Simulation module has a different theme. For example, in the previous years the assignments had healthcare, banking services, manufacturing, and logistics themes. This year our assignment is about airport operations management. All this variation allows you to appreciate how this fundamental subject can be applied to different problems which fundamentally have similar performance indicators. Enjoy this year’s assignment!

Aircrafts arrive at an airport according to an exponential distribution λ =40 minutes of time between arrivals.

Upon arrival, the planes would wait in the air for a signal from the control tower before they are able to land. The airport has two runways, one for landing and the other for taking off.

Upon allocation of the runway, the aircraft lands, the process of landing and clearing the runway follows a Triangular distribution of TRIA (1, 3, 5) minutes.

The taxi time between the runways and the terminal gates follows an Exponential distribution of λ = 10minutes. The passengers and luggage unloading delay time from the aircraft, follows an Exponential distribution of λ = 15minutes.

From the total number of all arriving flights at the airport, 20% go to Terminals 1, Terminal 2 takes 30%, and Terminals 3 and 4 each take 25%. Each terminal has a capacity of 5 gates.

Aircraft departures also follow the Exponential distribution of λ =35 minutes. The ratio of aircraft departure from each terminal is the same as arrivals (i.e., T1: 20%, T2: 30%, T3: 25%, and T4: 25%).

The loading time for all departing aircrafts at each terminal follows an Exponential distribution with λ = 35 minutes.

The runway maintenance team has to check for external objects on the runways they therefore, conduct routine manual inspections on each Runway. Due to safety guidelines both runways are closed during the detection. The inspection and cleaning process takes place every 5.5 hours and follows a Normal distribution with mean of (μ=15) and standard deviation of σ =3. The Meantime between failures follows the wait rule.

In this example ignore passenger check-ins etc.

  1. Develop a simulation model with appropriate animations of the airport operation system focusing on the use of the runways. Simulate the airport operation for 48hr cycle times (simulation time) and replicate for 5 times without initiating system.
  2. On average, what percentage of the time are the runways in the idle or busy state?
  3. Discuss the Utilisation of each Runway and Terminals on daily basis during the simulation run.
  4. Display the WIP for arriving planes, departing planes and the total WIP on one plot over a simulated time of 48hrs (for each simulation run). Do not initialize the statistics between your simulation runs.
  5. Assuming the Level of Sound Exposure from each aircraft is given by a triangular distribution with values 50, 60 and 100 decibels, display on a plot, over a simulated time of 60hrs, the total number of aircrafts in process that have a sound level above a specified threshold of 80 decibels. [Hint: You need to look at the WIP, also assign sound levels to airplanes when they are created]
  6. Assuming some of the departure aircrafts (1 percent) require emergency landing due to technical problem so they have priority in the queue. Please add this to your model and design and record the total number of aircrafts in process that have an emergency landing.
  7. Write a report that explains your modelling approach and process, explaining how key concepts such as waiting for signal from the control tower were modelled.
  8. Discuss the results of your simulation with regard to key performance factors: runway and terminal utilisation, WIP, noise pollution, waiting times and queues both in the air and on the ground to access terminals.
  9. Offer suggestions of how to improve the performance of this report with respect to the key performance indicators: runway and terminal utilisation, WIP, noise pollution, waiting times and queues both in the air and on the ground to access terminals. Your suggestions should be simulated, and results compared to the original model.
  10. The airport management wishes to double the number of aircraft that arrive and depart from the airport. Offer suggestions on how this could be possible with respect to maintaining or minimising the emission levels. Discuss your various suggestions by creating simulation models and comparing the results with one another. Use Run conditions defined as: Warm-up Period =12 hours, Replication Length = 72 hours, and Number of Replication = 5. The system requires initialisation between replications, but statistics should not be initialised. Hint: Create arrivals and departures separately. But make sure you dispose the aircrafts after unloading for arrivals and after take-off for departing aircraft.

 

This MN5617-Engineering Assignment has been solved by our Engineering Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing Style. Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered.

You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turn tin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.