Models of Data Centre Infrastructure Management - Management Assignment Help

Download Solution Order New Solution
Assignment Task:

Learning Outcomes Assessed: 

1:  Critically evaluate models of data centre infrastructure management and its strategic support in data centre design

2:  Model appropriate infrastructure solutions that reflect specific technological requirements for power within the enterprise level data centre and required service levels

Assessment Brief

For this assessment you will be given a specific set of requirements for a new data centre implementation for an example company scenario. You will need to analyse the requirements set out in the case study. Using academic sources you will propose a data centre design to meet the needs of the case study based on current research and best practice. Your report will include:

  • Computing resources to meet current and future capacity requirements

  • Proposals to manage the computing infrastructure

  • Discussion of networking and interconnections

  • Discussion of power, cooling and other services

  • Location considerations

Critical analysis and application of material you have read as you research this assignment is an essential component of this assignment. You must demonstrate that you have read widely using relevant academic sources and use this in your written report effectively. References from commercial sources and general internet sources can be used, but the majority of sources you cite must be from academic sources such as journals and books.

Case Study Detail: Megacorp Ltd

Megacorp have been in the Internet Service Provider (ISP) business for 25 years. They have decided that they need to adopt the public cloud in a big way in order to compete with other providers in their sector. 

They have decided to build a flexible AWS-style data centre to provide flexible commodity computing to their customers. Their design goals are:

  • 1 million cores

  • A mix of memory scales with upto 384 GB RAM per CPU (not per core)

  • An average of 16GB disk space per core

The company want you to design and specify the provision of computing and other resources for this data centre. You should plan and specify:

  • Different virtual machine node types to cope with different workload patterns. For example the AWS t2.nano node has 0.5GB RAM, 1 core and 8GB Disk, r5.xlarge offers 4 cores, 32GB RAM and more disk. You should specify some CPU intensive and Memory intensive node types.

  • The contents of a standard 42U rack in terms of compute and storage servers and networking equipment. It may be appropriate to have more than one rack design for the different nodes you plan to deploy.

  • Computer types to deploy. You can choose off-the-shelf standard hardware from Dell or similar vendors. Alternatively you can chose Open Compute Project hardware.

  • The networking infrastructure to connect within and between racks and on to the outside world.

  • The power and cooling requirements for your planned data centre

  • An outline of the software command and control system you suggest to deliver this flexible virtual machine-based infrastructure

For each of these discussion points you must specify what your solution is and give detailed reasons for your suggestions. Your suggestions and in particular your reasons must be backed by thorough academic references using the University’s standard Harvard notation.

 

This Management Assignment has been solved by our Management Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.