Highlights
1. Adding New Locations to Network
Steps
In Packet Tracer, open the ITT-116 Final Project pkt File (see 2nd attachment) and save it as firstInitiaLastNameT1AddLocations .
Turn off the power in Main-Office-Router and ad 5 NM-1SS serial modules to slots s2/0- s6/0.
Configure the slots as follows:
Document all the changes and rationales to the network as a summary for management. Include information explaining how networks transfer data, how network protocols (e.g., ARP) work to enable communication, and how the lower-level network layers support the upper
From a workstation on Switch-02 in the main location, ping each of the ports of each Copy the pings from the workstation's window and take a screenshot to turn in with the Packet Tracer file. Copy both into the Microsoft Word document saved as firstInitialLastNameT1AddLocations . Also, cop y-paste all the new router, Main-Office- Router, and new switch configurations into the Word document.
2. State of the Network Executive Report
Steps
Limiting VLANs
Steps
In Packet Tracer, open the firstInitialLastNameT1AddLocations file and save it as firstInitialLastNameT2LimitVLANs .
Review all VLANs and Previously, we allowed all VLANs to cross all trunks; this will no longer be the case.
Only allow VLAN 20, the server farm VLAN, to access Switch-03
Only VLAN 1, the Admin VLAN, should be allowed on Switch-02. Modify the trunk port configuration, similar to step 3, to do this. To test that it works, try to ping from the Engineering workstation on Switch-02. It should
All other workstations on Switch-02 are to be moved to Switch-01, with Engineering moved to a new switch, Switch-04 on the port where one of the Engineering workstations was Only the Engineering VLAN will be allowed to Switch-04. This is similar to step
Make sure the Engineering PCs can obtain an address by DHCP and can ping out.
Restrict the remote locations [1 and 2] to their respective
From the Sales workstation on Switch-01 in the main location, ping each of the ports of each Unlike Project 1, not all pings are expected to succeed. Note the failures
and whether or not they were supposed to fail. This should note that the VLANs are secure from seeing each other's data. Copy the pings from the workstation's window and make a screenshot to turn in with the Packet Tracer file. Copy both into a Microsoft Word document saved as firstInitialLastNameT2LimitVLANs . Also, copy all the new router, Main- Office-Router, and new switch configurations to the Word document.
Port Security Configuration
Steps
In Packet Tracer, open the firstInitialLastNameT2LimitVLANs file and save it as firstInitialLastNameT2PortSecurity .
Review all VLANs and All changes will be made to the main site only, not remote or new locations.
On all switches, at the main location, port security is to be enabled on all access ports. If you did not specify switchport mode access when you set up the port initially, you will have to do
So now and reassign the VLAN. You will know if you get the message - Command rejected: GigabitEthernet1/1 is a dynamic port.
Change the MAC address on a computer on the Admin VLAN, simulating the replacement of the computer, and note what Did it remain working? Why or why not? If it stopped working, how do you get it working again?
Do the same for a computer on another If the port remains up, try to ping from that workstation. What happens and why do you think it happened?
Add 4 workstations to the Main-Router access point VLAN. Ping from each of the workstations in any What happens and why do you think it happened? Did you get the laptops you expected? Why or why not?
Document all the changes in a summary for management in a Microsoft Word document, including rationales for all changes, to which you will add the testing in step
From a workstation on Switch-01 in the main location, ping each of the ports of each Note any failures and whether or not they were supposed to fail. Copy the pings from the workstation's window and make a screenshot to turn in with the Packet Tracer file. Copy both to a Word document saved as firstInitialLastNameT2PortSecurity. Also, copy all the new router, Main-Office-Router, and new switch configurations into the Word document.
This IT Computer Science has been solved by our PhD Experts at My Uni Paper.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.