OMGT2287 - Supply Chain Modelling and Design - Take Home Activity - Supply Chain Management Assignment Help

Download Solution Order New Solution
Assignment Task:
OMGT2287: Supply Chain Modelling and Design Assignment Help

 

Case 1
Recycling is an important and complex activity in Country A. To enable timely operations, the country is divided into 10 sectors and recycling operations are commenced simultaneously in each sector. The recyclable garbage is collected from public bins, loaded into trucks, and transported to recycling sites. Each site can accommodate different amounts of recyclable garbage because of its available land size at the facility. The annual capacities for five recycling sites are given in the table below (in megatonnes):

OMGT2287: Supply Chain Modelling and Design Assignment Help

The cost of collecting and transporting recyclable garbage primarily depends on the distance between the sectors and the recycling sites. The following table summarises the distances between each sector and each recycling site (in kilometres):

 

 

OMGT2287: Supply Chain Modelling and Design Assignment Help

It will cost approximately $111,905 to move one megatonne of recycling garbage for one kilometre. The management would like to maximise the amount of recycled garbage and minimise the transportation cost.

a. Formulate a multiple-objective linear programming (MOLP) model for this problem in

a Word file with a brief description of an equation, and implement it in an Excel spreadsheet.

b. Determine the optimal value for each objective in the problem.

c. Suppose the management considers maximising the amount of recycled garbage to be two times as important as minimising the transportation cost. Formulate a GP
model to optimise both objectives simultaneously with a brief description of an equation in a Word file, and implement the MOLP model in an Excel spreadsheet.
What do the results suggest?

Case 2
Company B is a retailer of i Mobile Phone in Australia that works 250 days in a year. The manager is determining a minimum-cost inventory plan for an upcoming phone to be launched in the market. She has collected the following information:
• Annual demand: 1,000 phones
• Phone cost: $919 each
• Phone RRP: $999 each
• Net weight: 174 g each
• Tare weight: 212 g each
• Annual inventory holding cost: 15%
• Cost per order to replenish inventory: $75
• Annual in-transit holding cost: 10%
• Freight rate: $7.50 per kg
• Time to process order for freight: 2 days
• Freight transit time: 5 days

Solve this problem using a non-linear programming (NLP) model to determine the followings:
a. Economic order quantity for the phone in units and in kg
b. The total cost for purchasing the phones
c. The total cost for ordering
d. The total cost for holding the inventory
e. The total cost for transportation
f. The total cost for holding the phones during transit
g. The total cost for this inventory plan
h. The number of orders
i. Ordering point
j. The profit from this inventory plan

Case 3
Paul is planning to buy a new car for his work as a trader. After narrowing his choices down to three models (X, Y, and Z) within his budget, he is having difficulty in deciding which one to purchase. He has compared each model against one another on the basis of four criteria: price, safety, economy, and comfort. His comparisons are summarised below:

 

OMGT2287: Supply Chain Modelling and Design Assignment Help

Paul wants to incorporate all of the four criteria into his final decision. However, the criteria are not equally important. The following matrix summarises his comparisons of the importance of the criteria:

 

OMGT2287: Supply Chain Modelling and Design Assignment Help

Case 4

 

OMGT2287: Supply Chain Modelling and Design Assignment Help

 


This OMGT2287: Supply Management Assignment has been solved by our Supply Management experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.