Assignment Task:

Task:

This assignment is designed specifically to assessthe required graduate attributes (ECSA Gas) for this subject.,The three GAs assessed are ELO 2: Application of scientific and engineering knowledge, ELO 9: Independent learning, and ELO 10: Engineering professionalism will be assessed using the attached rubric. All these GAs must be achieved in order to obtain a DP and pass this subject (as stated in the learner guide).

HAZOP STUDY AND PROCESS CONTROL UPDATE ON THE STEAM PLANT IN S3 BASEMENT LABORATORY.

HAZOP Study is carried out during operation or in an existing process to ensure that plant emergencies and operating procedures are regularly reviewed and updated as required. The Chemical Engineering Laboratory in S3 basement is required to carry-out and update a steam plant emergencies and operating procedures. As a process engineer available on site, you are required to carry- out the necessary work and lead this project.

The steam plant consists of the boiler, feed water tank, fuel tank, turbine and condenser. The fresh water is filled to the feed water tank to a certain level and feed the boiler to a certain level using the feed pump. Diesel is used as fuel in the boiler to boil the water to form pressurized steam. The pressurized steam is the force that cause the turbine to rotate at a very high speed to generate electricity. The low-pressure steam after pushing through the turbine is sent into the condenser where the steam is condensed to its liquid form. The condensate from the condenser returns into the boiler feed water tank. There is also a JOJO tank in the S3 basement laboratory that collect water from a distillation column condenser, evaporator and heat exchanger practicals instead of sending these streams to the drain.

2

IN THIS ASSIGNMENT, EACH STUDENT HAS TO CARRY OUT THE FOLLOWING TASKS:
1. Using a computer software (e.g. Ms Visio), draw a full P&I diagram of the current steam plant process.
2. Describe the current P&ID control system of the feed tank and the boiler, and state whether the controllers and/or sensors display/s are locally mounted or main panel mounted.
3. Tie in the new system from the JOJO tank into the steam plant process to save water and energy.
4. Perform HAZOP in full on the steam plant combining existing and the Tie in the above to make sure that all safety precautions are taken into consideration in the proposed mass and energy saving system.
5. Draw an updated P&ID system that you have just HAZOPed for information preservation.

 

This PCSC101: Management Assignment has been solved by our Management Experts at My Uni Paper. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment Experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.